1 / 2

Burnley Campus Magic Bean Logistics plan

Burnley Campus Magic Bean Logistics plan. Proposed Welfare Compound. Proposed delivery route onto site. Proposed storage/drop off area. Herras fence installed 2M back from Existing curtain. Gate to allow for pitches to be maintained. Temporary road to service both buildings.

marika
Download Presentation

Burnley Campus Magic Bean Logistics plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Burnley Campus Magic Bean Logistics plan Proposed Welfare Compound Proposed delivery route onto site Proposed storage/drop off area Herras fence installed 2M back from Existing curtain Gate to allow for pitches to be maintained Temporary road to service both buildings Site access gates Existing football pitched to be relined giving more access for vehicles whilst allowing for the pitch to be utilised Timber Hoarding line

  2. P&W Welfare facility on existing Holly Grove and Barden Logistics Site entrance gates Gates to allow for pitch to be maintained Re line football pitch in order to allow for more room for Vehicles to access site Temporary road under service bridge to allow to services both proposed buildings Access maintained to plant room Line of proposed hoarding

More Related