An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coordinated Transportation Investment Plan (CTIP) Community Forum March 8, 2005

  2. How are the transportation systems in Northgate performing today?

  3. PM Peak Corridor Level of Service (LOS) & Average Speed • Overall corridor LOS is performing well. • LOS E – westbound Northgate Way.

  4. PM Peak Intersection LOS and Delay • All intersections operate at LOS D or better. • Exception: 120th Street & Roosevelt Way.

  5. Traffic Simulation Northgate Way – PM Peak

  6. Traffic Simulation Northgate Transit Center/South Lot – PM Peak

  7. Traffic Simulation NE Northgate Way & 5th Avenue NE – PM Peak