An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Solar Hydrogen Project Group Update 9th June 2009

  2. Solar Hydrogen Project: Minutes • 1. General review: • Weizmann UK Meeting (6/7th July). Attendance: individual registration (at £50) will be required. KH to see if there is assistance for students to attend/discounts for a large order. Action: KH • Ashden Awards Meeting: poster for photochemistry not found; re-print for meeting. Action: SD. Posters required by 9am 10/6/09. • Blackboard resource for Solar Programme: links not working at present; material from the team members once these have been mended. Action: BT/Project Team. • Actions: the following progress against these was reported: • WO3 deposition for multi-well plate H2 sensor (SD/BT/FZ): FZ reported no further developments from UniSurrey. • KH will contact Paul Russell (Teeside Uni) for possible collaboration in coating technologies. Action: KH • Team to investigate other collaborators for other coating/deposition technologies. Action: Project Team • Solar simulator: visit Wed 3rd June. The urgency for a solution has been raised with LOT Oriel. • Doctor blading application of materials: i) awaiting date for collection of doctor blade machine from Hydrogen Solar Action: SD. ii) progress made on sourcing a squeegee. Will complete purchase this week. Action: FZ. • Identify and get quotation for a muffle furnace for treatment of large area (cavity: 20 x 20 x 20 cm) samples. Action: SD. • Dissemination of results: further meetings of interest were presented: • HySyDays: abstract (BT) submitted. • Abstract for WHEC submitted. • “Photoelectrochemistry” abstract to be written and submitted to Electrochem09. Action: SD. • Continue to identify hydrogen-related conferences and other forums. Action: ALL.

  3. Solar Hydrogen Project: Minutes 2. Progress and Actions: progress and actions for the next week follows. BT: LED arrays have been tested; intensity data for each was presented; the small array was ideal for growth studies; the large array was too intense and will require some additional control. Algal growth kinetics study started; cross-flow filtration: a unit will be loaned to the group, with option to purchase if successful. Need to check operation of pO2 probe; evaluate ion chromatography; chase up progress on patent application: Action BT. FZ: work on connections to bioreactor continued, with progress hampered by lack of interest from vendors and Sartorius. Action: FZ to progress with workshop; establish whether a centrifugal pump will affect algae. PG: Project methodology approved: work on model has started; Action: start investigation H2 storage. PB: require vitreous carbon disc electrodes, need to identify a suitable vendor. Action: PB. Electrochemical cell identified and modified. SD: email to Neil Alford and Nic Harrison written but not sent! Meeting held with Alex Bismarck: atmospheric plasma system appears suitable for film deposition tests. Action: Draw up plan for experiments. Continue to support development of model with database of key materials parameters. Other Actions: identify (and purchase) system for calibrating/determining spectral variation of light sources (e.g. StellarNet). Actions/Tasks carried over: surface engineering: surface texturing and fabrication with Cabral group. Set up meeting. CC: revised COMSOL simulation to proper convergence and obtained similar results. Run simple calculation of bubble formation in reactor. Quotation for quartz received. Action: complete costing for Ti components, nitrile sheet (gaskets) and fluid connections. Solar Hydrogen Group Technician. KH reported that agreement had been reached for technical support (Paul Crudge) for the group (3-4 days per week). This will run for 3 months in the first instance, to establish procedures and effectiveness. We will have to organise design work to make the most of Paul’s availability: prioritise work on reactors (1. BT vertical reactor; 2. CC photoelectrochemical reactor). Workshop jobs will still have to be submitted in the same way. Paul will be involved in the regular meetings. 3. Next Meeting: Tuesday 9th June at 16:00; Room 252. Please inform KH beforehand if you are unable to attend. Presentation material (suggest 1-2 pages, unless more are required) to be submitted to SD by 15:00 on the day, for Powerpoint presentation.

  4. Solar Hydrogen Project: PG • Meeting with SD arranged to discuss methodology. • Summary of process has been produced

  5. Solar Hydrogen Project: CC

  6. PEC Reactor Parts List

  7. Reactor – eMachineShopPTFE (PVDF not specified) Current exchange rate £1 = $1.53 LEEMARK £902 each for 3 reactors4 weeks WORKSHOP 6 weeks?

  8. Solar Hydrogen Project: SD • Ashden Awards: poster sent to Victoria H • Solar Simulator: one thing after another! • Muffle furnace: Elite Thermal Systems • BCF 11/15: 220x220x310 mm; ~£1700 • BCF 11/8: 180x190x235 mm; ~£1160 • Electrochem 09 • Photoelectrolysis Meeting: arranged for Friday 12th June

  9. Solar Hydrogen Project: SD • Photoelectrochemical measurements: • Started work on EPFL Fe2O3. Full set of experiments: • Dark: • CV • Impedance • Illuminated: • Photocurrent (dc and ac) • Photocurrent spectroscopy • Impedance (?)

  10. Solar Hydrogen Project: SD

  11. Ir Deposition Solar Hydrogen Project: PB O2 H2

  12. 4mx980mmx25mm 2000mmx700mmx10mm Corotherm Thinwall Polycarbonate Sheet Clear Prices range from: £92 - £545 per pack of 5 or £19 - £28 per sheet Suppliers: ScrewFix Aerial Plastics Jewson B&Q Home Base

  13. Various commercially available design systems Polyvent 300 Flat Channel Connector Polyvent 300 Round To Rectangular Description: Polyvent 300 2.0M Flat Channel Product Details: Code: 30200 Description: Polyvent 300 2M Flat Channel Brand: Brand Colour: WHITE Material: PVC Dimensions Length: 2 Width: 0.308 Height: 0.29 Polyvent 300 Elbow Bend / Plenum http://www.polypipe.com/polypipe/controller?action=VENTS-ViewCategory&categoryID=7467

  14. Design on progress

  15. Hi Fessehaye; Please find attached some results I have secured on your requirements. They are preliminary, and I am sure some annealing would further enhance the WO3 content. Can you also let me know about your group and your line manager, so that I can speak to Ravi and arrange how to proceed, if you think the films I have grown are acceptable? Kind Regards Damitha

  16. UniSurrey feasibilty study Results

  17. Room-temperature Raman spectra of (a) as-deposited WO3 film at 350 °C (1 ml/h for 1 h) and (b) annealed at 500 °C for 2 h in air. C. Matei Ghimbeu et al, Thin Solid Films 515 (2007) 5498–5504

  18. C. Matei Ghimbeu et al C. Matei Ghimbeu EDX spectrum of a WO3 film deposited at 350 °C (1 ml/h for 1 h) and annealed at 500 °C for 2 h in air. C. Matei Ghimbeu et al, Thin Solid Films 515 (2007) 5498–5504