An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Digital Hadronic Calorimeter Hardware/Electronics Status Manuel I. Martin

  2. GOALS Long Range Goals Immediate Goals Intermediate Goals “Get at least one layer of the ‘tower’ working as soon as possible using the Hamamatsu APD with minimum expenses” “Design ‘full’ DAQ system for the ~40K channels prototype for test on ‘a’ beam line” “Get two layers of the ‘tower’ working as soon as possible with minimum expenses” Manuel I. Martin

  3. People / Assigments • Until classes start at UIC • Ian Harnarine • Work on the QPA02 <-> APD (Hamamatsu) • Help on procurement • Shahab Khan • Work on the XYZ controls and Data Acquisition Manuel I. Martin

  4. Progress to date: • Make decisions to achieve immediate and intermediate goals as follows: • Design two separated ‘light tight’ boxes • to accommodate 6 PMT (16 channels) • to accommodate 2 Hamamatsu APD and/or one RMD SiAPD • Transfer the setup that Kurt uses to instrument 2 layers of the ‘tower’ • Start collecting necessary data from • Hamamatsu  • RMD ???? • QPA02 (R. Yarema ?) • Design • holder for the Hamamatsu APD (conceptual, interface with Sasha) • PC Board to interface Hamamatsu to QPA02 (impossible until data for QPA02) • Holder for the RMD SiAPD (impossible until data for QPA02) • PC Board to interface RMD SiAPD QPA02 (impossible until data for QPA02) Manuel I. Martin

  5. PHYSIC’S GOALS Technology First Level Simulations FIRST GENERAL GOALS FIRST MODEL SIMULATIONS FIRST GENERAL MODEL REVIEW GENERAL GOALS A WELL DESIGN PROGRAM ARCHITECTURE DESIGN DETAILED SIMULATIONS OF THE DESIGN MECHANICAL ELECTRICAL Detailed Simulation of the Design Test Prototype on TEST BEAM COMPARISON Manuel I. Martin