Integrated Production/ Distribution Model

Integrated Production/ Distribution Model. 2000. 01. 27 Byun, Myunghee SNU. IEFALab. Contents. Two papers ’ presentation “ IPDM for a multi-national company operating under varying exchange rates ” Incorporate exchange rates in the model

marilu
Download Presentation

Integrated Production/ Distribution Model

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Production/ Distribution Model 2000. 01. 27 Byun, Myunghee SNU. IEFALab.

  2. Contents • Two papers’ presentation • “IPDM for a multi-national company operating under varying exchange rates” • Incorporate exchange rates in the model • “Synchronized Development of Production, Inventory, and Distribution Schedules” • Capacity management, inventory allocation, vehicle routing을 고려하는 모델.

  3. An Integrated production-distribution model for a multi-national company operating under varying exchange rates Zubair M. Mohamed Department of Management & Information Systems, Western Kentucky University, USA IJPE 58(1999) 81-92

  4. Introduction-MNC environment • Multi-national company(MNC)’s condition • The number of countries of operation • The proportion of overall revenues • The growth of international trade • Liberalizing import restrictions • Diffusion of knowledge and technology • Transnational corporations : 24,000 in the world’s 14 richest countries(by UN Conference)

  5. Introduction • Relevant factors to research • Cost of production(manufacturing) • Distribution(logistics), labor costs(capacity) • Expertise in production and distribution(efficiency) • Currency exchange regulation & stability of foreign exchange(exchange rate)

  6. Integrated Production/Distribution model(PDM) efficiency Exchange rate Manufacturing cost Distribution cost Forecast coefficient for the exchange rate Base exchange rate

  7. Numerical examples

  8. Numerical examples

  9. Impression for this paper • Facility capacity는 efficiency보다 cost가 주 factor • Exchange rate를 모델에 고려. • 수식을 너무 간소화했다.(setup variable) • 가정 사항의 타당성 • Capacity change. • Exchange rate를 고려할 때와 고려하지 않을 때의 비교.

  10. Synchronized Development of Production, Inventory, and Distribution Schedules F. Fumero and C. Vercellis Dipartimento di Economia e Produzione, Politecnico di Milano, Italy Transportation Science Vol. 33, No. 3, 1999

  11. Introduction • Inventory/Routing problem • Production details-capacity allocation, lot size, setup • Distribution plan-vehicle routing • “Coordination of production and distribution”-by Chandra & Fisher(EJOR, 1994) • Multi-period horizon,multi-product, lot sizing & delivery routing problems

  12. Descriptions of model

  13. Integrated production/distribution model(IPDM) N = W{0} product vehicle time setup Binary vehicle travel Transported quantity production demand Resource level Delivered qty to customer k

  14. IPDM-continue Vehical capa. absorption

  15. The Decomposition Procedure • 앞의 model, constraints 2, 8 relaxation • Constraint 2 : to separate the lot-sizing and vehicle routing problems • Constraint 8 : to separate the integer and continuous Lagrangian multipliers jt, iltv Lagrangian dual problem : max, (PROD + INV + DIS + ROU) subject to iltv >= 0

  16. The Decomposition Procedure • 1. Production(PROD) • 2. Inventory(INV)

  17. The Decomposition Procedure • 3. Distribution(DIS)

  18. The Decomposition Procedure • 4. Routing(ROU)

  19. Solution Algorithms • Upper bounds(for Lagrangian dual problem) • Optimal value Pjt 를 이용해서, delivery schedule 결정 • 모든 customer k에 대해서, demand를 fully loaded vehicles과 residual demand로 나눈다. • One customer 이상을 serve 해야 하는 vehicles을 위한 route결정(by nearest neighbor heuristics) • At insertion step, a capacity check is executed.  The best results were summed up to compute the desired upper bound

  20. Solution Algorithms • Primal feasible solution • 1. a reasonable delivery plan • 2. Production volume Pjt V’ v V’ v v 0 v V’ v Possible routes associated to a feasible solution of DIS

  21. Computational Results

  22. References • P. Chandra & M. L. Fisher, “Coordination of Production and Distribution Planning”, EJOR. 72, 503-517(1994) • F. Fumero, C. Vercellis, “Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation”, IJPE, 49, 45-54(1997) • S. S. Erenguc, N.C. Simpson, A.J. Vakharia, “Integrated production/distribution planning in supply chains : An invited review”, EJOR, 115, 219-236(1999) • M. Minoux, “Mathematical Programming : Theory and Algorithms”, John Willey & Sons, 1986