Report Working Group “Cavity design and construction”

Report Working Group “Cavity design and construction”. Status of collaborations Tasks and deliverables were identified https://edms.cern.ch/document/993472/1.1 Work-packages, work package owners and planning being established Several work-packages are not yet distributed (next slide)

marja
Download Presentation

Report Working Group “Cavity design and construction”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report Working Group “Cavity design and construction” SPL collaboration meeting Vancouver 8-9 May 2009 • Status of collaborations • Tasks and deliverables were identified https://edms.cern.ch/document/993472/1.1 • Work-packages, work package owners and planning being established • Several work-packages are not yet distributed (next slide) • Collaboration partners identified – several approvals pending

  2. Report Working Group “Cavity design and construction” SPL collaboration meeting Vancouver 8-9 May 2009 • Work-package owners still to be identified for • Manufacture of cavities (except for a few prototypes) • Design and manufacture of frequency tuner • Manufacture and test of HOM coupler • Inspection equipment for on-line and post mortem analysis: temperature mapping / detection of quench location by second sound delay / optical inspection equipment (Questar® type)

  3. Report Working Group “Cavity design and construction” SPL collaboration meeting Vancouver 8-9 May 2009 Collaboration partners (some approvals pending)

  4. Report Working Group “Cavity design and construction” SPL collaboration meeting Vancouver 8-9 May 2009 Progress on observations from 1st SPL collaboration meeting

  5. Report Working Group “Cavity design and construction” SPL collaboration meeting Vancouver 8-9 May 2009 Progress on observations from 1st SPL collaboration meeting (cont’d)