160 likes | 320 Views
Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department. Capital Strategic Objective. Maintain and initiate improvements to existing facilities to ensure the safety and security of MPD employees
E N D
Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department
Capital Strategic Objective • Maintain and initiate improvements to existing facilities to ensure the safety and security of MPD employees • Fund technology and capital equipment projects that allows MPD to provide neighborhood police presence, prevent crime, apprehend criminals, and investigate criminal activity in the City of Milwaukee
Capital Funding • 2009 Budget $6.7 million • $1.1 million expended • $4.8 million encumbered • $800,000 available for evidence storage and PAB electrical substation • 2010 budget $4.2 million • 2011 REQUEST $7.3 million
2009/10 Accomplishments 5th District Station HVAC upgrade NTF renovation, parking lot expansion Evidence Storage Warehouse upgrade 4th floor HVAC, fire alarms, chiller 911 System Replacement 911 System, Call Recording System, telephones, voice mail all integrated
2009/10 Accomplishments • PAB cooling tower replaced • PAB electrical substation upgraded • PAB COMP STAT Room completed • PAB Space Utilization Study/Master Building Plan completed
2010 Capital Projects:Early Stages • PAB Jail Cell Door Replacement • Automated Fingerprint Identification System • 4th District Station HVAC replacement • PAB Mechanical Shafts • Liners failing and nearing capacity • PAB Domestic Water Pump Replacement • 40 y/o – obsolete equipment; repair and parts difficult • At capacity limits • PAB Lower Garage Floor Restoration
2011 Capital Budget Request • Evidence Warehouse $593,000 • Movable shelving – Homicide floor • Security system – proximity readers • Automated elevator controls • Fire suppression system
2011 Capital Budget Request PAB fire pump replacement $85,000
2011 Capital Budget Request D #2 Replace Emergency Generator $100,000
2011 Capital Budget Request Radio Shop HVAC Replacement $200,000
2011 Capital Budget Request • Tiburon RMS VMP Upgrade $354,000 • Major Capital Equipment • Front-end Loader (for snow removal) $70,000
PAB Rehab/Code Compliance Project Milwaukee Police Department Be A Force
PAB Rehab/Code Compliance Project • Building’s HVAC infrastructure is obsolete and parts are hard to find/replace • Piping/plumbing system is failing • PAB does not meet hi-rise code compliance • No fire sprinklers or code-compliant alarm system • Stairwells too close together; code compliance requires pressurization • Replacement of fire pump recommended • Code compliant generator required for life-safety systems • Electrical systems need upgrading • Hazardous materials (asbestos) exists in ceilings and walls • Building “envelope” deteriorating – thermal value is poor (wasted energy-steam and electricity), windows are inefficient
PAB Rehab/Code Compliance Project Any renovations to PAB require asbestos abatement and fire code compliance for high-rises • Abatement alone: • $2.9M in 2012 • $3.1M in 2013 • $3.3M in 2014 • Window replacement approx. $150,000/floor • Fire sprinklers ONLY approx. $92,000/floor • Average per floor rehab cost is $4.5M • Approximately $240/sq foot
2011 Capital Budget Request • PAB Renovation $5.9 million • Mechanical/HVAC shaft replacement • net of $2.3M in 2010 budget • And significant hi-rise upgrades to bring PAB up to code compliance • Architectural and engineering fees to begin the re-hab work starting at Level 5