An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. By Jennifer Sanborn The Memorial ReceptionBuilding Arlington National Cemetery

  2. The Memorial Reception Building Outline • Electrical • New Emergency Generator • Lighting • Reception room • Work area • Crypt chapel • Amphitheater • Mechanical Breadth • Coordination Issues • Plenum Reorganization • New Diffuser Type

  3. Emergency Generator Design St epping

  4. Emergency Generator Design St epping

  5. Emergency Generator Design S i z ing

  6. Pane ls Emergency Generator Design

  7. S ing l e Line Emergency Generator Design

  8. S ing l e Line Emergency Generator Design

  9. The Reception Room

  10. The Reception Room Schema t i c

  11. The Reception Room Lumina i re s

  12. The Reception Room Foot cande l s

  13. The Reception Room Foot cande l s

  14. The Reception Room Render ing s

  15. The Reception Room Render ing s

  16. The Reception Room Render ing s

  17. Work Area

  18. Work Area Goals • Flynn Mode • Hazy Quiet • Indirect fluorescents • Create interest Go a l s

  19. Work Area Schema t i c

  20. Work Area Lumina i re s

  21. Work Area Foot cande l

  22. Work Area Render ing s

  23. Work Area Render ing s

  24. Mechanical Breadth Layout

  25. Breadth Design Criteria: NC:<30 2 diffusers Each 230 CFM New Design: Perforated and louvered ceiling diffusers X50/L for max ADPI: 2.0 (ADPI Selection Table) Max ADPI: 96>80 good X50/L=2.0 L=13feet X50 = 13 x 2.0 = 26 feet (throw)

  26. The Memorial Reception Building Mechani ca l Breadth Selection NC:29 Throw: 22 feet Corner Diffuser