30 likes | 172 Views
Closing Plenary Meeting Report for SG 100G Group (1/3). Meeting was called to order at 8.05 am on September 17 and finished at Sep tember 19 at 10.45 am . Number of meetings: 4 Total number of attendees : 14 Total number of contributions: 4 Contributions on Tuesday AM1
E N D
Closing Plenary Meeting Report for SG 100G Group (1/3) • Meeting was called to order at 8.05 am on September 17 and finished at September 19 at 10.45 am. • Number of meetings: 4 • Total number of attendees :14 • Total number of contributions: 4 • Contributions on Tuesday AM1 • Contribution #1 : Thomas Kürner, TU Braunschweig (Germany), SG Inauguration/Tasks of SG; (Document 15-13-0524-02-0thz) • Contribution #2 : CaiYunlong, Huawei (China) ,“Data Center Traffic Characteristics and 100Gb/s Demand”; (Document 15-13-0519-00-0thz) • Contribution #3 : Rick Roberts, Intel (USA), A Terse Protocol Layer Tutorial; (Document 15-13-0545-0thz) Thomas Kürner, TU Braunschweig
Closing Plenary Meeting Report for SG 100G Group (23) • Contributions on Tuesday AM2 Contribution #4 : Rick Roberts, Intel (USA), “Suggested draft text for SG 100G PAR and 5C “; (Document 15-13-0504-0thz) • Tasks completed during the meeting: • SG Leadership has been completed: • Chair: Thomas Kürner (TU Braunschweig) – already appointed at July Plenary • Vice-Chair: IwaoHosako (NICT) – Straw Poll 9 yes/0 no /1 abstain • Secretary: CaiYunlong (Huawei) – Straw Poll 10 yes / 0 no / 0 abstain • Technical Editor: Rick Roberts (Intel) – Straw Poll 10 yes / 0 no / 0 abstain • Press Release on the formation of the new study group has been discussed. • Initial Working Draft for PAR and 5C have been created (Documents 15-13-0522-01-0thz and 15-13-0523-01-0thz, supporting Document 15-13-0561-01-0thz,) • Work on theTechnical ExpectationDocument(TED)“. The content of the TED has been discussed and updated (Document15-11-0745-10-0thz) Thomas Kürner, TU Braunschweig
Closing Plenary Meeting Report for SG 100G Group (3/3) • Tentative Timeline for the SG • November 2013 Plenary: • 1st joint meeting with 802.1 • January 2014 Interim: • 2nd joint meeting 802.1 • Finishing complete draft PAR and 5C ready for WG approval and submission to EC • March 2014 Plenary: • Adressing comments and getting PAR and 5C done • May 2014 Interim • Potential Kick-off of a Task Group Thomas Kürner, TU Braunschweig