New Solid Waste Management System in Lahore (Technical Aspects)

New Solid Waste Management System in Lahore (Technical Aspects). Contents of Presentation. Vision Behind New SWM System in Lahore Formation of Lahore Waste Management Company (LWMC) Why was Company needed? Transition from old to new SWM System Other Initiatives & Way Forward.

martat
Download Presentation

New Solid Waste Management System in Lahore (Technical Aspects)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Solid Waste Management System in Lahore (Technical Aspects)

  2. Contents of Presentation • Vision Behind New SWM System in Lahore • Formation of Lahore Waste Management Company (LWMC) • Why was Company needed? • Transition from old to new SWM System • Other Initiatives & Way Forward

  3. Vision Behind New SWM System • To modernize the SWM system in Lahore • To transform Lahore into one of the cleanest cities of the world

  4. Impediments • Lack of institutional capacity • Faulty outsourcing model • Financial constraints

  5. Reasons for the Change

  6. Formation of Company • CM Punjab envisaged establishment of a company on the basis of Turkish model. • LWMC established on March 19, 2010 under section 42 of the Companies Ordinance 1984.

  7. Signing of the Services and Asset Management Agreement • Services And Asset Management Agreement (SAAMA) signed on June 25, 2011 • Assets, resources and functions were transferred to LWMC • Residual functions like; • Enforcement, regulation and levy of tax

  8. Strategic Direction of LWMC

  9. Agreement with M/s. ISTAC • Agreement signed on 27th December 2010 for technical support; • Waste characterization study • Capacity building of professionals • Identification and designing of integrated waste disposal facility • Designing of new waste management system

  10. Design of New System • Turkish experts of ISTAC identified the gaps in the existing system • New system was designed to outsource SWM services to international companies

  11. International Bidding • Competitive and transparent bidding process adopted • Tenders floated in Financial Times and Gulf News • Contractors selected after detailed technical and financial evaluations

  12. Turkish Companies • The contract was signed on 3rd November, 2011 for a duration of 07 years with two Turkish companies namely; • M/s Al-Bayark in Zone I. • M/s OzPak in Zone II.

  13. Zoning of Lahore

  14. Transition from Old to Modern Solid Waste Management System

  15. Current System – Street Sweeping • Poor quality of sweeping • Inadequate & obsolete equipments • No health & safety gadgets

  16. New System – Street Sweeping • Improved quality of sweeping • Improved design of tools and equipments • Proper health & safety gadgets and uniforms for workers

  17. Current System – Mechanical Sweeping • Obsolete & inefficient technology • High emissions of dust • Inadequate coverage • Poor quality of sweeping

  18. New System – Mechanical Sweeping • Modern, efficient technology • Less / no dust emissions • Coverage of all main roads of Lahore • Better sweeping quality

  19. Current System – Waste Storage • Littering & open heaps in the absence of door to door collection • Inadequate and improper storage equipments • Open storage of waste

  20. New System – Waste Storage • Introduction of door to door collection through bags • Installation of adequate number of new type of containers & waste bins

  21. Current System – Waste Transportation • Open waste transportation • More than 20 years old machinery • Inefficient waste transportation fleet • Lack of fleet monitoring

  22. New System – Waste Transportation • No littering during transportation • New, modern & efficient vehicles • Fleet monitoring through advanced technologies

  23. Current System – Washing • No specialized vehicles for washing • Manual drainage after washing • Rare washing of squares/ walkways

  24. New System – Washing • Specialized washing vehicles with high pressure • Very less drainage effort • Regular washing of major squares / walkways

  25. Role of Citizens in New SWM System • Follow the waste schedules / timings • Do not throw unwanted materials (acid, cigarettes etc) in containers • Volunteer for protection of containers of your area from fire and stealing

  26. Other Initiatives & Way Forward

  27. Sale of Waste to Private Sector • Agreement of sale of waste to private sector; • DG Khan Cement • PNO Waste Management Expected Technologies include : Segregation, composting or energy from landfill Gas, anaerobic digestion or RDF

  28. Development of Model Areas • Local Area Office for complaint redressal • Waste collection in commercial areas • Special arrangements after rains and storms

  29. Integrated Landfill Facility • Establishment of integrated landfill facility • Site identified • Geo technical investigations conducted • NOC from EPD issued • Land procurement in process

  30. Removal of Waste from Open Plots • Removal of waste from over 2000 open plots • Resolution of complaints • from ECRS (1318), Dengue surveillance committee (200) • Special Branch

  31. Establishment of waste transfer stations at suitable locations • Establishment and outsourcing of integrated waste disposal facility

  32. Development of systems in consultation with ISTAC for : • Hospital • Industrial • Construction & Demolition waste

  33. Development of a proper legal framework for SWM System • Integration of DHAs and Cantonments • Revenue generation through waste streams

  34. DOCUMENTRY ON NEW SOLID WASTE MANAGEMENT SYSTEM IN LAHORE Video