Planning update

Planning update. DCS WS 6.10.05 L.Jirdén. HV. LV. PC and PLC H/W. TMON. FEE. VHV. RODC. LASER. PULSER. GOOFIE. TPC DCS INTEGRATION. ALICE DCS INTEGRATION. ECS – DAQ INTEGRATION. pre-installation at SXL2 TPC. 2005. 2006. June. Nov. Dec. June. Aug. July. July. Aug. Jan.

matt
Download Presentation

Planning update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning update DCS WS 6.10.05 L.Jirdén

  2. HV LV PC and PLC H/W TMON FEE VHV RODC LASER PULSER GOOFIE TPC DCS INTEGRATION ALICE DCS INTEGRATION ECS – DAQ INTEGRATION pre-installation at SXL2TPC 2005 2006 June Nov Dec June Aug July July Aug Jan Apr Oct Feb Mar Sep May TPC CHAMBER MOUNTING TPC FEE TPC COMMISSIONING RACKS NETWORK DSS B-END GCS

  3. HV LV LIQ TMON pre-installation at SXL2HMPID 2005 2006 June Nov Dec June Aug July July Aug Jan Apr Oct Feb Mar Sep May HMPID COMMISSIONING PC and PLC H/W RACKS NETWORK DSS GCS ? B-END HMPID DCS INTEGR. ALICE DCS INTEGR ECS/DAQ INTEGR

  4. HV LV TMON pre-installation at SXL2MUON TRACKER 2005 2006 June Nov Dec June Aug July July Aug Jan Apr Oct Feb Mar Sep May MTK MOUNTING MTK COMMISSIONING PC H/W RACKS NETWORK DSS GCS B-END MTK DCS INTEGR ? ALICE DCS INTEGR ECS/DAQ INTEGR

  5. pre-installation at ?? 2005 2006 June Nov Dec June Aug July July Aug Jan Apr Oct Feb Mar Sep May COMMISSIONING RACKS NETWORK DSS GCS B-END Any other detector needing Central Services for pre-commissioning? Let us know!

  6. Detector groups: DETECTOR APPLICATIONS SOFTWARE Central Team: INSTALLATION AND VALIDATION B-END COMP and systems Batch 1 TEST GUIDE F-ENDCOMP and Standard software Batch 2 REQ F-END COMP and Standard software Batch 3 PURCH PURCH TODAY Final Installation Jan 05 Jan 06 Sept 06 Mar 2007 April 2007 PHASE 1 PHASE 2 PHASE 3 PHASE 4 HMPID TOF/TRD PHOS TPC/ITS VacuumFMD/V0/T0 RB26 FMD/V0/T0 RB24 PMD TOFTRD Stage2VacuumL3 doorsShield Muon spectrometer

  7. ACC will provide* integration of services* interface to ECS ECS DCS Detectors will provide* Integration of subsystems* Interface to DCS … … gas power Control Units … racks det D det E det B … sub-sys 1 sub-sys 2 sub-sys 1 sub-sys 2 Device Units … … device a device b device e To physical devices

  8. DETECTORS DETECTOR APPLICATIONS ACC • ALICE STANDARDS: • - ALICE DCS State Diagrams (HV, LV, FEE, Detector DCS, ALICE DCS) • Guidelines & Conventions for ALICE PVSSII Control Software • ALICE DCS Computing Rules JCOP FRAMEWORK PVSS TOOLS ALARM ARCHIVAL FW CORE CONFIGURAT ARCHIVAL CONDITION DEVICE COMPONENTS ACCESS PVSS CONFIG FEE CONFIG APPLICATIONS TRENDING CONNECTION: OPC, DIM, DIP PVSS applications

More Related