APTA Rail Transit SMS Implementation Guide

A comprehensive guide for rail transit agencies to implement Safety Management Systems (SMS) in compliance with FTA MAP-21/FAST Act regulations. Covers safety management policy, risk management, safety assurance, and safety promotion. Includes crosswalk matrices and next steps.

matthewu
Download Presentation

APTA Rail Transit SMS Implementation Guide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APTA Rail Transit SMS Implementation Guide June, 2016

  2. What is APTA Rail Transit SMS Implementation Guide? • Appendix A of APTA SMS Manual • Replaces APTA Manual for the Development of Rail Transit System Safety Program Plans (2001) • Used to be called the APTA Urban Rail Manual • Provides guidance in implementing SMS within rail transit agencies (RTAs) • Rail Transit Definition • Light rail • Subway • Streetcar • Automated guideways/Peoplemovers • Cable car • Funicular/Ropeways • Monorail

  3. Goals of APTA Rail Transit SMS Guide • Method for preparing/revising existing System Safety Program Plans to be compliant with FTA MAP-21/FAST Act requirements • Assists the RTA in preparing for internal/external safety management reviews and assessments • Shows how the RTA demonstrates diligence to the safety of its operations • Fosters the RTA’s commitment to continuous improvement • Assists the RTA in establishing a risk based process to evaluate hazards and mitigate consequences to acceptable levels • Provides guidance to the RTA in building an effective safety culture within the organization

  4. SMS Pillar 1Safety Management Policy • Component 1: Safety Management Policy • Safety Management Policy Statement • Authority • Purpose and Scope of the SMS Guide • Goal for the SMS • Identifiable and Attainable Objectives • Strategic Program Planning • Safety Culture

  5. SMS Pillar 1 (cont’d) • Component 2: Safety Accountabilities and Responsibilities • System Description • Organizational Structure • Accountability of Key Personnel • Organizational Context Requirements for Safety

  6. SMS Pillar 1 (cont’d) • Component 3: Integration with Public Safety and Emergency Management • Inter-Departmental Coordination • Inter-Agency Coordination • Emergency Planning and Response

  7. SMS Pillar 1 (cont’d) • Component 4: SMS Documentation and Records • SMS Guide Development and Communication • Update of the SMS Guide • Administrative Controls • Safety Plan Documentation

  8. SMS Pillar 2Safety Risk Management • Component 5: Hazard Identification and Analysis • Hazard Identification • Component 6: Safety Risk Evaluation and Mitigation • Hazard Evaluation • Hazard Mitigation • Risk Reduction

  9. SMS Pillar 3Safety Assurance • Component 7: Safety Performance Monitoring • Safety Data Acquisition and Analysis • Safety Performance Measures • Safety Data Analysis • Accident/Incident Reporting and Investigation • Rail Corridor Operational Safety • Infrastructure Maintenance and Inspection • Vehicle Maintenance, Inspection and Repair • Passenger Operational Environment Programs

  10. SMS Pillar 3 (cont’d) • Component 8: Management of Change • Configuration Management • Safety and Security Certification • Component 9: Continuous Improvement • Safety Assessment • Internal Safety Management Reviews • External Safety Management Reviews • Safety Culture Assessment

  11. SMS Pillar 4Safety Promotion • Component 10: Safety Communication • Workplace Safety Program • Industrial/Occupational Safety Program • Fitness for Duty Program • Drug and Alcohol Program • Fatigue Program • Medical Monitoring Program • Critical Incident Debriefing-Post Traumatic Stress • Cognitive Distraction and Attentional Error • Track Access and Roadway Worker Protection

  12. SMS Pillar 4 (cont’d) • Component 10: Safety Communication (cont’d) • Contractor Requirements for Safety • Contracting for Services • Contracting for Facilities, Equipment and Materials • Construction Management • Materials Management • Public Safety Programs

  13. SMS Pillar 4 (cont’d) • Component 11: Competencies and Training • Rules and Procedures Review • Training and Certification • Board of Directors • Rail Transit Agency Personnel • Contractor Personnel • Emergency Response Personnel

  14. Crosswalk MatrixSMS Pillar 1, Component 1

  15. Crosswalk MatrixSMS Pillar 1- Component 2

  16. Crosswalk MatrixSMS Pillar 1 – Component 3

  17. Crosswalk MatrixSMS Pillar 1 – Component 4

  18. Crosswalk MatrixSMS Pillar 2 – Component 5 and 6

  19. Crosswalk MatrixSMS Pillar 3 – Component 7

  20. Crosswalk MatrixSMS Pillar 3 – Component 8, 9

  21. Crosswalk MatrixSMS Pillar 4 – Component 10, 11

  22. APTA Manuals - Next Steps • Appendix B- Bus Transit SMS Implementation Guide • Appendix C – Commuter/Passenger Rail SMS Implementation Guide • Updated APTA Audit Program