1.09k likes | 1.39k Views
Megger - Substation overview. 170 product groups, 2600 products. MEGGER Insulation testers, fibre optic testing MULTI-AMP Circuit breaker test tests BIDDLE High voltage test sets AVO Multimeters,Training , software DUCTER Ohm meters FOSTER Oil test sets STATES Terminal blocks
E N D
MEGGER Insulation testers, fibre optic testing MULTI-AMP Circuit breaker test tests BIDDLE High voltage test sets AVO Multimeters,Training, software DUCTER Ohm meters FOSTER Oil test sets STATES Terminal blocks METROSONICS Critical systems monitoring PROGRAMMA Relay/ Circuit Breaker/ Battery Testing PAX DIAGNOSTIC Transformer, Insulation Products Megger Brand Names
IEC 61850 STANDARD IN SUBSTATION AUTOMATION • Main purpose of the standard is to achieveinteroperabilityamong different devices from different vendorswithin the same substation.
IEC 61850 STANDARD IN SUBSTATION AUTOMATION • What is Substation Automation? • Weneed to knowwhatwe are talkingabout, in order to understandwhatneeds to be standardized.
In a substation there are Primary Equipments: THE POWER SUBSTATION
THE POWER SUBSTATION • The Primaryequipments in the Substation need to be ”controlled”. • The wordCONTROL in a substation has nothing to do with Process Control, where the wordCONTROL is usuallyassociated to ”feedback systems”:
Busbar change. Load is on Busbar 2 THE POWER SUBSTATION
Busbar change. Connecting Busbar 1 to Busbar 2 THE POWER SUBSTATION
Busbar change: Connecting the Feeders to Busbar 1 THE POWER SUBSTATION
Busbar change: Disconnecting feeders from Busbar 2 THE POWER SUBSTATION
Busbar change: Disconecting Busbar 2 from the system THE POWER SUBSTATION
Busbar change. Busbar 1 in service THE POWER SUBSTATION
One very simple interlocking: • EarthingSwitch and Disconnector THE POWER SUBSTATION • I can OPEN / CLOSE the Disconnector ONLY if the EarthingSwitch is OPEN. • If the EarthingSwitch is CLOSED I cannotoperate the Disconnector.
EARTHING SWITCH CLOSED THE POWER SUBSTATION
EARTHING SWITCH OPEN THE POWER SUBSTATION
THE INTERLOCKING SYSTEM A LocalAction (open/close) mayrequire: Localinformation (from the same bay) Remoteinformation (from different bays)
In a substation there are Primary Equipments….. THE POWER SUBSTATION
… that must be protected. THE POWER SUBSTATION
THE PROTECTION RELAYS • The circuitbreakeropens and interruptsthe faultcurrent. The relaysees no faultconditionsanymore and it resets. Circuit breakerremainsopen, the fault has beencleared.
Radial Feeders: No communication THE PROTECTION SYSTEM
Radial Feeders: No communication THE PROTECTION SYSTEM
Radial Feeders: No communication THE PROTECTION SYSTEM
Radial Feeders: No communication THE PROTECTION SYSTEM
Radial Feeders: Communication THE PROTECTION SYSTEM
Radial Feeders: Communication THE PROTECTION SYSTEM
Radial Feeders: Communication THE PROTECTION SYSTEM
Radial Feeders: Communication THE PROTECTION SYSTEM
IEC 61850 APPLICATION: PROTECTION • PROTECTION signals (Trip, Block, Acceleration..)are sent through the station bus.Horizontal communication
GOOSE communication for PROTECTION and CONTROL GOOSE = GenericObjectOrientedSystem Event. Is an unacknowledgedmulticastmessage that is repeated with a certainstrategyallowing the supervision of the Horizontal Communication.