330 likes | 583 Views
Sunset Substation. Community Design Meeting #3. Welcome and Introduction Final Vision Statement Solar Study Analysis Alternate Design Schemes Preliminary Cost Comparison Questions and Comments. Agenda. www.sunsetsubstation.org. Vision Statement. Abstract Statement to
E N D
Sunset Substation Community Design Meeting #3
Welcome and Introduction Final Vision Statement Solar Study Analysis Alternate Design Schemes Preliminary Cost Comparison Questions and Comments Agenda
Vision Statement Abstract Statement to Guide Future Decision Making
This public parcel should be repurposed for community use. Incorporate renewable energy technologies that allow power generation and public use to coexist. Empower and inspire community involvement in the maintenance and stewardship of the site. Vision Statement
CommunityBuilding CoveredPlaza Storage &Solar Equipment W. 65th St. Alley The Big Roof Scheme 32nd Ave. NW
CommunityBuilding Plaza Storage &Solar Equipment W. 65th St. Alley The Pair Scheme 32nd Ave. NW
CoveredOutdoorPlaza CommunityBuilding W. 65th St. Storage &Solar Equipment Alley The Wedge Scheme 32nd Ave. NW
Total Project $660,000 Solar Component (160 panels) $390,000 Conceptual Cost Comparison THE BIG ROOF SCHEME THE PAIR SCHEME THE WEDGE SCHEME Total Project $775,000 Solar Component (131 panels) $450,000 Total Project $730,000 Solar Component (114 panels) $285,000
THE PAIR SCHEME THE BIG ROOF SCHEME THE WEDGE SCHEME