An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MANAGEMENT REVIEW PHOENIX AZ BRANCH 711 AUGUST 2011

  2. MANAGEMENT REVIEW • Action item request JUNE 2011 • Sergio Rosas/ Daniel Bailey • Need action plan for returned pipe and where to stage also need location map on pipe yard to be posted on fork lift and yard quality board • Target date - July 29, 2011 • Yard map finished ,Sergio Rosas to approve yard map to be posted by Daniel B at locations, action plan still in process of being completed. • Closed -August 5, 2011 • Yard map approved, maps posted meeting held with employees on map and staging • ACTION ITEMS FOR JULY 2011 • Daniel bailey • Need water line run thru out warehouse to feed new eye wash stations • TARGET DATE - AUGUST 31, 2011 • Closed - August 19,2011 • Price to run water to locations and cost of new eyewash stations too costly versus the cost of the existing eyewash cartridges. • RESULTS OF AUDITS - Zero in august

  3. MANAGEMENT REVIEW • Customer feedback • Incident reports customer • 1.C-711-111, DRRS Plumbing – Matrix error for some reason his multiplier was taken out . error code C-16 (Joe Balestreri) • SURVEYS: Zero received back august

  4. MANAGEMENT REVIEW • Supplier performance &conformity • 1. S-711-021, ALLIED – 2 Lifts of 1x21 Dyna thread short ¾ inch pipe staged in quarantine area and tagged waiting on upper management & vendor for final decision.(Sergio Rosas) • 2. S-711-020,FPPI – Short 9 signs part # f0207400,called vendor they shipped the 9 signs that were short.(Sergio Rosas) • 3. S-711-019, Victaulic- Vendor shipped 4 inch not 6 inch p/n & their p/s was correct. Vendor notified they are shipping correct material. (Danny Garcia) • 4. S-711-018, Victaulic – Ordered sprinkler heads and received 4 grooved 45’s,paperwork was correct. Vendor notified they are shipping correct material.(Danny Garcia)

  5. MANAGEMENT REVIEW • Measurable Objective July 2011

  6. MANAGEMENT REVIEW • Overview of key performance indicators • SUPPLIERS: • • 1. COMPLIANCE TO AML = 100% • • 2.Suplier nonconformance's-Four to report in August • • 3. Product inspection-Allied 2 LIFTS OF 1 INCH PIPE 21-0 long was found to be ¾ inch short. • • 4. Suppliers on time deliveries 100% in June. • • CUSTOMER: • • 1.0n-time delivery rate= 91% • 2.Customer feedback (incident reports) total of six incident reports. • • 3. customer surveys – Zero turned in August • • 4. total credits for the month of July • Internal performance: • • BPR=92.9% • • Tax discrepancy -ok at this time • • Freight billing -within limits • • Repair on equipment-Refurbished battery charger for picker/ manlift $ 700.00 • • Days of inventory on hand 30 • • Dead inventory on hand 2% • may zero injuries • Auto/truck incidents-zero to report • Safety inspection-up to date no incidents to report • • Training on associates-Steven Blais fork-lift training needed

  7. MANAGEMENT REVIEW • Overview of corrective actions/incidents reports • AUGUST 2011 • Corrective action reports –zero to report • Customer incidents- 1 • Supplier incidents-4 • Internal incidents- 0

  8. MANAGEMENT REVIEW • Preventive actions –one to report for august on pipe yard and staging closed 8-15-11 • Training &resource needs- fork lift training for Steve Blais • Changes impacting quality management system (changes in business) none at this time.