An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Westborough Public Library

    Space Plan Presentation February 2014
  2. A little history The Westborough Public Library began in 1777 as a lending library that was located in the Parkman Store. 1807: Union Library Society formed. 1857: Ownership of the library transferred to the town. 1868: Moved to Town Hall. The library stayed in the old Parkman Store until 1868, when it was moved to the Town Hall. 1908: Land purchased, building constructed & opened. 1980: Building expanded.
  3. Space challenges Shifts in the way people use the space Furniture/fixtures old and worn Space is not flexible Insufficient meeting space Some structure-related issues
  4. Technology Infrastructure Power & data infrastructure are insufficient for a 21st century library. Over a century’s worth of wiring/cables inside the walls.
  5. Future Projections Overall, undersized for future population Staffing level below national standards Circulation on an upward trend over 10 years.
  6. Conclusions Staffing & technology are at 2003 levels Insufficient parking, study space, computers Long range plan goals
  7. Possible Solutions
  8. Main Floor
  9. Lower Level
  10. Funding the Improvements Planning and Design grant (July 2014) Construction grant round expected in FY2015 First projects would begin around FY2017 Excluded items Staffing improvements