1 / 7

What is (tcoe) testing center of excellence

Software testing is a long and multi-layer process which involves a lot of development and probing for the software. Quality assurance and quality management have never been as important as they are now.

Download Presentation

What is (tcoe) testing center of excellence

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What is (TCOE) testing centre of excellence?

  2. Software testing is a long and multi-layer process which involves a lot of development and probing for the software. Quality assurance and quality management have never been as important as they are now. • So in order to test the quality, reliability, scalability and resource usage of a software, they have to undergo software performance testing. • Performance testing is a subset of performance engineering, an emerging computer science practice which strives to build performance into the design and architecture of a system, prior to the onset of actual coding effort.

  3. To ensure reliability, availability and stability of applications, enterprises must focus on quality assurance. To achieve this, they need to build dedicated teams that study the quality of the system in question. • The solution is a robust framework that enables enterprises to establish strong quality processes and is conducted in the (tcoe) testing center of excellence in agencies. • TCoE is a centralized testing model that brings people and infrastructure together into a shared services function for standardizing test processes, optimizing utilization of resources and creating re-usable test assets / repositories in order to generate enhanced benefits across the organization.

  4. Following performance testing, software are sent to a process which is conducted to ensure that system requirements meet business needs. • The process allows for any issues to be fixed before the system goes live. This is called user acceptance testing. It may involve black-box testing performed on a system like a piece of software, lots of manufactured mechanical parts, or batches of chemical products prior to its delivery. • It is the last phase of the software testing process. During UAT, actual software users test the software to make sure it can handle required tasks in real-world scenarios, according to specifications.  • There are many reasons why acceptances testing is important. One of the most important being demo and stepping into the end users shoes. The unique angle of user acceptance testing (UAT) is to test software as an end user.

  5. It does not focus on the cosmetic errors, spelling mistakes or system testing. • This test is to be conducted in the final stage of Software Development Life Cycle (SDLC) prior to system being delivered to a live environment. • User acceptance testing users or end users are concentrating on end to end scenarios & typically involves running a suite of tests on the completed system with production like data setup. • UAT is performed after System Testing is done and all or most of the major defects have been fixed.  • The main purpose of this testing is to validate the end to end business flow. • Software is built to give users tangible results. It tells you how usable the system is as most user acceptance testing is based on is best performance by software in real life

More Related