1 / 15

Lessons learned from the PALOMBINA PILOT PROJECT

Lessons learned from the PALOMBINA PILOT PROJECT. Basic Facts about the pilot project. Palombina Pilot Project Palombina beach, Ancona Municipality of Ancona and Adriatic ICZM Expert Group Realization planned for 2009. Today. RAILWAY. ANCONA. Today. Today. Image of Palombina beach.

max
Download Presentation

Lessons learned from the PALOMBINA PILOT PROJECT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lessons learned from thePALOMBINA PILOT PROJECT

  2. Basic Facts about the pilot project • Palombina Pilot Project • Palombina beach, Ancona • Municipality of Ancona and Adriatic ICZM Expert Group • Realization planned for 2009

  3. Today RAILWAY ANCONA

  4. Today

  5. Today

  6. Image of Palombina beach RAILWAY CYCLISTIC PATH SHORE LINE

  7. Results attended

  8. Results attended

  9. NOURISHMENT SITE (6 miles to come back) How WORK HARBOUR SITE around 500.000 m3 of sand To dredge Distance from dredged site to the nourishment, 6 miles to go

  10. Technical information • The sand dredged in Ancona harbor is an option for the beach nourishment of Palombina • The quantity of sand for linear meter of coast: 200 m3 for a meter of beach • The working technique is a refluent dredge off the breakwater defense • The additional cost for harbor work consisting in pushing longshore the sand stocked on the seaside is equal to € 100.000,00.

  11. Cyclistic path from tourist port of Ancona

  12. Activities completed • Meetings with experts • Spatial data collection • Feasibility study • Partnership between public and private organizations • Working maps produced

  13. Follow up activities planned • Planning barriers and/or relocation for the railway • Planning a possible tourist revaluation of Palombina beach, redevelopment of existing structures and construction of new ones • Creating of green areas

  14. Implementation • Palombina is a complex sandy landscape divided between two municipalities, with a strong private activity. At the higher level we needed to achieve a public & private network for the whole area. • Is it realistic? • Yes, absolutely. • Why?All the actions are planned considering the environmental, social and economic impact. • The keywords are “simplicity” and rationality.

  15. Lessons learned • It was successful because the proposed plan satisfies actual needs of the beach • The hardest part of the work wasa creating working network • That surprised us the most wasthe interest and commitment for the realization of the plan • We are particularly proud ofthe real feasibility of all the project

More Related