An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Johnson Electric Facility Zacatecas Plant

  2. Description Johnson Electric “J.E.” Facility “Zacatecas Plant” Located 1 km from Zacatecas International Airport with address Blvd. Morelos #1109 Parque Industrial Aeropuerto, Municipio de Morelos, Zacatecas, México, the facility is placed in a land with 74,754.217 SqMt The building includes Production area, administrative and finance offices, guard house, chemical room, utilites areas. Includes docks doors and installations room. Construction of main building: Walls: Reinforced concrete walls (Tilt-up) prefabricated . Metal Structure, columns, trusses and joists. Metal roof 22 gauge. Concrete floors with urethane finish Roofing system TPO Building equipped with Fire Protection System (sprinklers and portable extinguishers), HVAC (4 Make Up units on roof, heaters and exhaust fans for restrooms). Will include two electrical substations, 1500 and 1000Kvas.

  3. Descriptive Memory Construction Areas: Production Area 6,577.73 m2 Office Area 583.08 m2 Production Restrooms 44.63 m2 Compressors &Electrical Room 80.13 m2 Cafeteria 149.49 m2 Chemical Room 30.25 m2 Guard House 15.00 m2

  4. Progress of Project

  5. Greenland

  6. Site Cleanup

  7. Earthworks

  8. Metal Structure

  9. Metal Structure

  10. Trusses and JoistsAssembling

  11. Tilts-up Erection

  12. Tilts-up Erection

  13. Facades

  14. Main-South Facades

  15. West-North Facades

  16. Concrete pouring

  17. West-North Facades. Guard House

  18. Earthworks on South Area

  19. Interior View

  20. Panoramic View. Main Façade

  21. Panoramic View. Facades

  22. Panoramic View. Interior

  23. Concrete Floors Polish to Apply Urethane

  24. Exterior Views

  25. Exterior Views

  26. Main Facade

  27. Offices

  28. Guard House

  29. Panoramic Views

  30. Highlights Tilt up walls: Thebuilding’sperimeterwalls are builtout of reinforced concrete panelsmakingthempart of themainstructure, withthissystemthebuilding’slifeisbetween 60 to 70 years (20 years more than a regular building) Light weightstructure:It’sdesignmakesit more versatiletohang pipes, cable trays, etc as well as a muchcleanerspace. (NOTE: Ifnecessarytohang more installationsreviewwithstructuralminimumrequirements) TPO roofingsystem: Thissystemisveryreliable and durable, normal systemslifetimeaverages 10 to 12 years, thissystemlifetime can go up to 20 yearswithoutanydoubt (purchasingextendantwarranty),in additionthesystem has beeninstalledbyone of thefewsubcontractorsrecognizedby FIRESTONE TPO membranesystems and theonlyonethat has reachedplatinumcertification in alltheAmericascontinent. Concrete aprons and curves: Theaprons and curves of thetrafficareas has beenupgradedto be out of concrete in ordertoextendtheirlifetime and durabilityto intense traffic. Floorsealant: Floorsealantwillhelpthe concrete slabtowithstand intense forklifttraffic , extendit normal lifetime as well as tohave a muchcleanerspace. Cafeteriaexpansioncapability: Theconstruction of thisareawasleftwithpreparationstoadd a kitchentoitand as off todayit can serve 96 people at thesame time. Buildingexpansioncapability: As per designthebuiding can expandtowardsthe back of thebuilding as much as JE requires.

  31. Highlights Domes and highwindows: Thisaddtothebuildingwillhelp reduce the use of electricalpowerthereforelowelectricalbillshaving a costreduction of about 5% aproximately. Retentionponds:Withthisfeature JE ishelpingtheenvironmentbycapturing as much rain water and filling back theundergroundmantle.

More Related