S78. S67. S56. PC. PM. SEQ. S45. PIC. EE. VAC. CYO. QPS. Summary of sector 45 operational tests. On behalf of all the people Involved in the HWC. PM. PC. SEQ. PIC. S45. EE. VAC. CRY. QPS. Cryo Performance. 120. 100. 80. 60. 40. 20. NOV07. DEC07. JAN08. FEB08.
E N D
S78 S67 S56 PC PM SEQ S45 PIC EE VAC CYO QPS Summary of sector 45 operational tests On behalf of all the people Involved in the HWC R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Cryo Performance 120 100 80 60 40 20 NOV07 DEC07 JAN08 FEB08 S45 R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary PCS: Splice Check (200 A) PLI3: Circuit Protection at I_INT S45 PCC: Power Converter Configuration PIC2: Interlocks Test PNO: Powering to Nominal R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary (*) Short circuit detected at warm - circuit condemned (to be repaired during warm-up). S45 R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary S45
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary S45 24.02.08 13H 24.02.08 25.02.08 24.02.08 14H
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary • PGC Matching Section (13-14.02.08): IPQ 120 A S45 R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary LL5 S45 R. Alemany LHCCWG
PGC Arc (+ MR4&LL5) (19.02.08): PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary • Test Plan: • 2 kA FPA • 4 kA FPA • Heat Run @ 9kA + squeeze S45 R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary Heat Run with RB, QD, QF @9kA (19.02.08) RB VS_FAULT S45 R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary MR4 & LL5 Squeeze (19.02.08) S45 R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary • PGC Summary: • RB settings generated from calibration curves obtained from FIDEL model. • The rest of the magnets: linear calibration from layout database. • Ramp to 5.3 TeV. • Optics used: V6.500. • PGC of sector 45 done with LSA and timing system for synchronized ramps. Tests driven by: • LHC Sequencer: PGC of the Matching Sections (see slide 7). • Equip State: PGC of the Arc (see slide 9). S45 R. Alemany LHCCWG
PM PC SEQ PIC S45 EE VAC CRY QPS Powering Test Summary • Special thanks to: • HWC Teams. • LHC OP Team. • LSA Team. • Database Management Team. • Sequencer Team. Please, forgive me if I forget somebody S45 R. Alemany LHCCWG