An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 5 Light Wood Frame Construction

  2. Light Wood Framing Advantages • Flexible • Easily constructed • Economical Disadvantages • Burns rapidly, • Decays if exposed to moisture • Changes volume with moisture changes • Framing unattractive (must be covered)

  3. History - Prior to mid-1800s • Timber Frame timber with masonry timber with earth fill • Interior walls were simple plank structure • Trees were plentiful, and labor was intense. • Craftsmen were available, but tools were limited – and had to be operated by hand.

  4. History - mid 1800s • Light wood framing advanced by • Development of water powered saw mills • Machine made nails became available • Earliest Version of Lt. Wood Framing • Balloon Framing Long lengths of material was plentiful Wood members were small & easily handled Provided for lateral stability

  5. Balloon Framing • Erection of wall framing members on a wood sill secured to the foundation and lapped against the floor joists. • Second floor joists lapped into the wall framing system. • Roof framing then set on top of wall plates. Roof rafters tied to ceiling joists secured lateral displacement of exterior walls. • Components were light in comparison to timber structures, and erection required minimal labor than before. The practice was a more efficient use of material.

  6. DISADVANTAGES OF BALOON FRAMING • Long, straight lengths of material diminished in availability as more structures were built. • When buildings caught fire, the wall cavity of balloon framing allowed fire & smoke to chimney all the way to the roof, and structures burned rapidly. • Since the wall and floor structure were built integrally, most of the framing work was done off the ground, where level conditions might not exist.

  7. PLATFORM FRAMING • With the disadvantages of balloon framing, the platform frame system evolved. • The floor structure was first built onto the foundation sill, then decked to provide a ‘platform’ on which to work. • Ground-floor walls were erected with a top plate to receive the second floor joists, which became a sill on which to erect the upper floor joists – which, when decked became another platform. • Single floor framing was more plentiful because of shorter lengths.

  8. Building Sequence • Architect Plans and Designs the Facility – Then Prepares Design and Construction Documents • Involve a selected Contractor, who: • Obtains Building Permit • Purchases necessary materials • Selects Sub-Contractors for each phase of work • Excavation for utilities, foundations • Install Underground utility lines (electrical, plumbing) • Foundation construction • Floor Construction • Erect Framing for Structure

  9. Build construction pad & set batter boards

  10. Batter boards enable accurate layout of foundation

  11. A transit ensures accurate angles in layout

  12. A level is used to ensure proper grades & elevation

  13. Excavate & Place Foundations • Materials Typically Used: • Site Cast Concrete • Concrete Masonry Units • Reinforcing Steel • Tie wire • Anchor Bolts • Foundation and Basement Wall Construction • Construction for support of loads • Damp proofing and/or perimeter insulation

  14. Foundation Wall Systems Sill Anchor Concrete or CMU Wall Damp-proofing Drainage Stone under floor slab with Vapor Barrier Gravel for Drainage Perforated Drainage Pipe Concrete grade beam

  15. Utility installation is simultaneous with foundation work

  16. Installation of Plumbing Drainage Piping Underground Plumbing

  17. Example of grade beam monolithic with concrete floor Wall Load Granular Base Thickened Slab on grade

  18. Installation of plastic vapor barrier under concrete floor Vapor Barrier Granular SubBase

  19. Foundation Insulation • Some building codes require perimeter insulation at foundations – especially in cold climates. • Insulate the Crawl Space or Basement Walls • Attach to Platform or on Ground • Vapor Barrier

  20. Building the Platform Frame in Wood Floor With Crawl Space • Sequence of Assembly • Install sills with insect barriers • Bolt sill members to the Foundation • Install floor framing and bridging • Install floor decking

  21. Attachment to the Foundation • Sill Material • Treated for resistance to insects & decay in damp climates. • Install insect shields • Sill Attachment with anchor bolts

  22. Floor Framing Options FRAME WITH DIMENSION LUMBER FRAME FLOORS USING TRUSSES

  23. FRAME FLOORS WITH “I” JOISTS

  24. Floor Framing Spacing & Splicing • Spacing • Factors that determine joist spacing: • Floor Loading & Span Length • Strength of Joist Material Used • Type & thickness of floor decking • Designation - Inches “o.c.” (on center) • Typical - 12” , 16”, or 24” – to fit standard lumber lengths)

  25. Bridging for Floor Framing

  26. Floor Framing Using Steel Anchors

  27. Decking over Floor Framing • Materials Used • Plywood or OSB • Concrete or gypsum is poured over second floor decks for sound deadening • Installation • Deck is laid perpendicular to floor joists • End joints are staggered to brace joists • Power nails, screws, construction adhesive

  28. Building Sequence for Ground Floor Walls Layout • Sole plates installed to define wall locations • Wall Framing - Lay out studs & assemble with single top wall plate • Tilt up walls on the Platform & fasten to sole plate • Install second layer of top wall plate to tie all partitions and walls together. • Install Wall Sheathing • Corner bracing required for lateral stability – usually OSB or plywood at all exterior corners

  29. Framing Terminology Top Plate - Doubled Stud Header Sheathing Decking Sole Plate

  30. Headers • Headers are beams installed over openings to carry weight of second floor or roof loads. • Sizing Factors: Load, Span, Material • Materials: dimension lumber, Laminated wood, orSteel

  31. Erecting the Wall Framing • Build framing on the Platform & Tilt-up, brace, and fasten to sole plates.

  32. Double Top Plate • Joist Support • Tie Framing Together

  33. Double Top Plate Double Header Header Supports

  34. Corner Framing

  35. Sole Plate Anchorage

  36. Wall Sheathing • Materials: • OSB or Plywood for corner bracing • Insulating Sheathing - (no structural qualities)

  37. Exterior Wall Sheathing: • Joins & stabilizes the structure • Resists uplift • Resists racking & lateral forces • Provides surface for finish material

  38. Building Sequence PLATFORM & 2ND Story Walls • Erect 2nd Story Platform • Similar to 1st Floor Sequence • Install 2nd Floor access (stairs) • Erect 2nd Story Walls & Sheathing • Similar to 1st Floor Sequence

  39. Building Sequence Attic Floor & Roof • Options • Build-in-place ceiling joists, rafters, and bracing, OR • Prefabricated Trusses, OR • Combination

  40. Roof Framing Built-in-Place Ridge Board Rafters

  41. Collar Ties

  42. LOOKOUTS TO FORM OVERHANGS GABLE FRAMING

  43. Prefabricated Roof Trusses

  44. Note Strand Orientation Hurricane Clip

  45. Metal clips in decking prevent uneven deflection