Capacity Development for CDM Project

Capacity Development for CDM Project. Presentation of Selected PDD Methane capture and combustion from swine treatment for Peralilo By Kwaku Wiafe Senior Project Officer KITE. ….innovating energy solutions…. Outline. Description Baseline methodology Additionality

Download Presentation

Capacity Development for CDM Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capacity Development for CDM Project Presentation of Selected PDD Methane capture and combustion from swine treatment for Peralilo By Kwaku Wiafe Senior Project Officer KITE ….innovating energy solutions….

  2. Outline Description Baseline methodology Additionality Monitoring Methodology and Plan Calculation of GHG emissions Environmental Impacts ….innovating energy solutions….

  3. Project Description • Owner - Agrosuper, largest pork production company in Chile • Project - Install an advanced waste management system to reduce GHG emissions from pig and poultry waste • Technology -anaerobic digester and activated sludge treatment • GHG reduced - CH4, N2O and CO2

  4. Baseline Methodology • Approach - Technology representing economically attractive course of action • Open lagoon system being used as per voluntary agreement with government • Used by 50% of pork industry in Chile due to low cost • Waste water stored in lagoons for 5-9 months then applied on land as irrigation and fertilizer

  5. Application of Baseline Methodology • List of possible baseline scenarios • Solid Storage – Land Application • Pit Storage – Land Application • Storage lagoon – Land Application • Anaerobic lagoon – Land Application • Press Anaerobic Lagoon – Land Application • Digester – Land Application (phase I) • Digester–Aerobic Treatment (phase II) • Solid Separation-Composting-Land Application

  6. Baseline Methodology • Initial Screening based on: • Legal Constrains • Historical Practice • Available Technology • Manure management system appropriate for national conditions • Conclusions-Possible Baselines are options 4,5,6&7

  7. Baseline Methodology-Economic Comparison (1)

  8. Baseline Methodology-Economic Comparison (2)

  9. Baseline scenario boundary CH4 N2O CH4 N2O Disposal of Treated manure Manure from livestock Open air anaerobic lagoon Particulate removal (every 10 years) Project Boundary

  10. Project scenario boundary-Ph 1 Flare or Boiler Gas measurement CH4 N2O CH4 N2O CH4 Disposal of Treated manure Manure from livestock Storage Lagoon Digester Settled Solids Land Application Project Boundary

  11. Project scenario boundary-Ph 2 Flare or Boiler Gas measurement CH4 N2O CH4 CH4 CH4 Disposal of Treated manure Manure from livestock Aerobic post treatment Storage Lagoon Digester Settled Solids Land Application Project Boundary

  12. Monitoring Methodology • Approved methodology – AM0006 • Monitored parameters and default values used to calculate project emissions and reductions to baseline • Animal population • Average pig weight • Manure flow rate • Flow of sludge from Aerobic Treatment • 5 days BOD • Nitrogen content of manure • C02 concentration in gas flow • Flare efficiency • Biogas flow

  13. Estimation of GHG

  14. Environmental impact/SD Benefits • Odours reduced • Pathogen and vector control • Treated water suitable for irrigation • Potential use of biogas for electricity generation

  15. Stakeholders comments • Positive comments received • No objections to project received • All requests for clarification and information dealt with in a timely manner

  16. Conclusion • PDD generally reflects that for organic waste projects • Key issues to note: • How additionality was determined • Data requirements for monitoring

  17. Thank You