1 / 12

Capacity Development for CDM

Capacity Development for CDM First Regional Workshop for North Africa and Middle East Tunis, 25-26 January 2003 Status of the activities of the Phase I for the NA&ME Samir Amous, APEX, Tunisia Regional Centre for North Africa and Middle-East

eloise
Download Presentation

Capacity Development for CDM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capacity Development for CDM First Regional Workshop for North Africa and Middle EastTunis, 25-26 January 2003 Status of the activities of the Phase I for the NA&ME Samir Amous, APEX, TunisiaRegional Centre for North Africa and Middle-East Tel : +216 71 848 094 --- Fax : +216 71 843 453amous.apex@gnet.tn CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  2. PHASE IPROGRESS CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  3. First visits to the countries • Egypt : 9-13 September 2002 • Institutional and Administrative arrangements for phase I (FPAEgyptian Environmental Affairs Agency, NTSE : Tabbin Institute for Metallurgical Studies) • Jordan : 23-26 September 2002 • Institutional and Administrative arrangements for phase I (FPAThe General Corporation for Environement Protection, NTSE : Project unit at GCEP) • Morocco : 1-4 October 2002 • Institutional and Administrative arrangements for phase I (FPA : Dept Environement, Climate Change Unit, NTSE : GERERE) • Merging UNDP and UNEP project CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  4. First National workshops Egypt : 17-18 décember • High level attendance – High interest - Good stakeholder consultations • Very open forum on CDM in general and perspectives for the future in Egypt • Draft workshop reports recently received • Project well received • Workplan and institutional settings for phase II well received CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  5. First National workshops Morocco: 8-9 January 2003 • High level attendance – High interest - Good stakeholder consultations • Very open forum on CDM in general and perspectives for the future in Morocco • Advanced discussions on project portfolio and on DNA • Institutional settings : merging the UNDP and UNEP CD for CDM – a project unit will be established with a project coordinator will work around a core DNA unit under Dept of Environment • Draft Workplan prepared • Draft workshop report to be released during the Regional Workshop CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  6. First National workshops Jordan : 24-26 February 2003 • Will include a one-day awareness raising • Consultations have already taken place for the organization of the workshop CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  7. Progress Reports for Phase I • Egypt : • Draft version released before the first national workshop • A second version received recently – to be discussedincludes workplan, institutional settings and budget allocation for Phase II • Morocco : • A draft version likely to be discussed during the first regional workshopincludes workplan, institutional settings and budget allocation for Phase II CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  8. Progress Reports for Phase I • Jordan • A draft version likely to be discussed during the first regional workshopincludes workplan, institutional settings and budget allocation for Phase II • This version should be discussed during the first national workshop in 24-26 February CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  9. Early February: • Institutional settings and contractual arrangements to be started End of February: • Reports for Phase I finalized • National Workshop Reports finalized • Regional Workshop Report finalized CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  10. End of the first phase : First week of March : • Aggregate Regional Report finalized CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  11. PHASE IILAUNCHING CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

  12. At latest : Second week of March : • Administrative arrangements in place • Contractual arrangements in place (FPA, NTSE, project Unit in Morocco) CD for CDM - Phase 1 - First Regional Workshop, Tunis 25-26 January 2003

More Related