1 / 28

Minimum Measure 6: Pollution Prevention and Good Housekeeping

Minimum Measure 6: Pollution Prevention and Good Housekeeping. Gravel in gutter. Minimum Measure 3: Illicit Discharge Detection and Elimination. Grass raked into gutter. Minimum Measure 3: Illicit Discharge Detection and Elimination. Storm Drain. Gravel / trash. Yard waste.

medwin
Download Presentation

Minimum Measure 6: Pollution Prevention and Good Housekeeping

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Minimum Measure 6: Pollution Prevention and Good Housekeeping Gravel in gutter

  2. Minimum Measure 3: Illicit Discharge Detection and Elimination Grass raked into gutter

  3. Minimum Measure 3: Illicit Discharge Detection and Elimination Storm Drain Gravel / trash

  4. Yard waste Minimum Measure 3: Illicit Discharge Detection and Elimination

  5. No BMPS in place Minimum Measure 4:Construction Site Runoff Control

  6. Need Best Management Practices Minimum Measure 4:Construction Site Runoff Control

  7. Need BMPs Minimum Measure 4:Construction Site Runoff Control

  8. Minimum Measure 6:Pollution Prevention and Housekeeping Storm Drain Trash / Litter

  9. Storm Drain Stenciling Program Minimum Measure 2: Public Participation and Involvement

  10. Minimum Measure 4:Construction Site Runoff Control Bare soil in gutter

  11. Minimum Measure 4:Construction Site Runoff Control Need BMPs

  12. Need BMPs Minimum Measure 4:Construction Site Runoff Control

  13. Need BMP Maintenance Minimum Measure 4:Construction Site Runoff Control

  14. Minimum Measure 5:Post Construction Runoff Control

  15. Minimum Measure 3:Illicit Discharge Detection and Elimination Paint

  16. Minimum Measure 3:Illicit Discharge Detection and Elimination Oil / Antifreeze leaks

  17. Minimum Measure 5:Post-Construction Management Sediment

  18. Minimum Measure 4:Construction Site Runoff Control Bare soil Storm Drain

  19. Minimum Measure 5:Post-Construction Management

  20. Minimum Measure 6:Pollution Prevention and Housekeeping Sediment

  21. Minimum Measure 6:Pollution Prevention and Housekeeping

  22. Minimum Measure 4:Construction Site Runoff Control Bare Soil Storm Drain Gravel

  23. Minimum Measure 4: Construction Site Runoff Control

  24. Minimum Measure 4:Construction Site Runoff Control

  25. Minimum Measure 4:Construction Site Runoff Control

  26. Minimum Measure 4:Construction Site Runoff Control

  27. Minimum Measure 6:Pollution Prevention and Housekeeping

  28. Minimum Measure 3:Illicit Discharge Detection and Elimination

More Related