1 / 21

Reconstruction of HHS Courtyard

Reconstruction of HHS Courtyard. Carson Edge Jeremy Chwastowski Ryan Landry Joel Griffith. Overview. Introduction. Objectives Visually pleasing More seating Increase everyday use Address special events Constrained to remove orange pad. Phase 1. Rounding of Paths. Lunchroom Paths.

meena
Download Presentation

Reconstruction of HHS Courtyard

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reconstruction of HHS Courtyard Carson Edge Jeremy Chwastowski Ryan Landry Joel Griffith

  2. Overview

  3. Introduction • Objectives • Visually pleasing • More seating • Increase everyday use • Address special events • Constrained to remove orange pad

  4. Phase 1

  5. Rounding of Paths

  6. Lunchroom Paths

  7. New Eating Area

  8. Terraced Plant Beds

  9. Terraced Planting Beds Continued

  10. Benches

  11. Umbrella Tables

  12. PA System

  13. Art Area

  14. Phase 1 Overview • Removal of two trees • Removal of four light poles • 170 total seats • Cost - $71,000 • Flexible design • Tables are path oriented • Removal of bushes

  15. Phase 2

  16. Pathways

  17. Flooring

  18. Tables

  19. Phase 2 Overview • 24 additional seats • Address special events • Dances • Luncheons • Ceremonies

  20. Final Costs

  21. Questions

More Related