180 likes | 201 Views
One fundamental challenge in wind energy development is resolving the "chicken and egg" problem - renewable projects struggle to secure contracts under RPS procurement procedures without assurance that existing transmission infrastructure can accommodate them. Simultaneously, utilities are hesitant to invest in the necessary transmission upgrades without guaranteed demand. This article explores strategies to navigate these obstacles and foster the growth of wind energy projects.
E N D