1 / 7

Transmission arrangements for distributed generation

Transmission arrangements for distributed generation. DCMF 9 April 2008. Pre consultation document. Pre-consultation document Issues associated with DG.

razi
Download Presentation

Transmission arrangements for distributed generation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transmission arrangements for distributed generation DCMF 9 April 2008 Pre consultation document

  2. Pre-consultation documentIssues associated with DG • Transmission charging arrangements do not provide a level playing field for transmission and distribution connected generation in terms of cost-reflectivity • Access arrangements do not provide a level playing field in terms of access allocation as DG “jumps the queue” • No contractual framework for exporting GSP’s • DG not directly visible to NGET causing difficulties in • Investment planning • Demand forecasting • Outage and fault level planning

  3. Pre-consultation documentTransmission charging • Current arrangements do not reflect the transmission investment costs incurred as a result of generation connecting to the distribution networks • ‘Embedded benefit’ of ~£18/kW provides additional incentives for generation to embed • ‘Actual’ embedded benefit estimated to be ~£7.50/kW • Demand savings ~£5.75/kW • Generation connection savings ~£1.50/kW • Commoditisation of the residual element would not reduce the embedded benefit for average load plant

  4. Pre-consultation documentProposals • CUSC modification regarding thresholds associated with a request for a Statement of Works by the DNO (CAP097) shortly • Inviting views regarding second CUSC modification to introduce a new entry product for exporting GSP’s • Presenting two competing potential enduring solutions for industry comment • GNSAM strawman • Net DNO Agency Model strawman

  5. Pre-consultation documentGNSAM (1) CVA Registered Embedded Generator Supplier Pays TNUoS generation tariff directly to National Grid, minus a cost reflective discount for explicit access rights Responsible for SVA generator output and pays TNUoS generation tariff minus discount on behalf of SVA registered generator Pays supplier TNUoS generation tariff minus cost reflective discount for implicit access rights Contract with the DNO for connection GBSO Distribution Network Operators SVA Registered Embedded Generator Contract with the DNO for connection

  6. Pre-consultation documentNet DNO Agency Model (1) Directly connected demand Generator Books and pays for TEC + short-term products Supplier Books and pays for TOC + short-term access products via supplier Transmission Books and pays for TEC/TOC + short-term products (overrun, sharing. Non-obligated release, short-term demand product) Notify requirement and pay for TEC Embedded Generator Distribution Network Operators Supplier Notify demand requirement and pay for TOC

  7. Pre-consultation documentNext steps • Pre-consultation expected to be published mid-April for a six weeks consultation period • Proposing modification to existing CAP097 thresholds • Inviting views on: • GNSAM and Net DNO Agency Models presented as potential enduring solutions, in consideration of TAR • Appropriateness of developing an entry product for exporting GSPs at this time, given that this is a step in the direction of a Net DNO Agency model

More Related