SFHHA 2012 Annual Healthcare Summit. The Built Environment: Passing Inspections First Time & Every Time. Meet Brian Before the Inspection. CONSTRUCTION SURVEY CHECKLIST. The following checklists were compiled to assist in the successful survey of construction.

Download Presentation

SFHHA 2012 Annual Healthcare Summit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SFHHA2012 AnnualHealthcare Summit

  2. The Built Environment: Passing Inspections First Time & Every Time

  3. Meet Brian Before the Inspection

  4. CONSTRUCTION SURVEY CHECKLIST • The following checklists were compiled to assist in the successful survey of construction. • The facility is only required to pass the final survey in order to utilize the project for its intended purpose. • It is strongly suggested that the facility utilize the following checklist to properly prepare for the 80% and final construction surveys. • http://ahca.myflorida.com/MCHQ/Plans/

  5. “Resistance is futile”

  6. AHCA 80 PERCENT SURVEYS • At the 80 Percent Survey, walls, ceiling assemblies and shaft walls should be completed. • Door frames, windows, stair, railings, etc., should be installed. • All mechanical equipment should be set and all ductwork and dampers installed. • All electrical equipment and devices should be in place and main power feeds connected. • Functioning Infection Control Systems. • Site access, storage and staging.

  7. 80 Percent ?

  8. DEFINITELY NOT READY

  9. 80 Percent

  10. A - TEAM

  11. PERSONNEL WHO MAY BE PRESENT AT SITE • Project architect • Project engineers (MEP) • Project manager • Superintendent • Drywall contractor • Mechanical contractor • Electrical contractor • Owner or owner’s representative (at least at exit interview) • Laborers to move ladders, equipment, etc.

  12. EQUIPMENT • Ladders—at least one for each discipline (large projects may require more) • Flat head and Philips screwdriver, pliers or wrench, drywall saw, etc. • Flashlight (for owner’s representative) • Two-way radios for each discipline tuned to the same frequency (for large projects) • Table and chairs at a pre-selected area for plan-review, conference and exit interview

  13. JOB ISN’T DONE UNTIL…

  14. PAPERWORK • Set of construction documents approved by AHCA • Sprinkler working drawings approved by AHCA • Life safety plan (preferably reduced for convenient use) • Outstanding AHCA plan review comments • All AHCA approval letters • All correspondence from AHCA • All change orders and field orders • Previous AHCA construction survey letters

  15. MANUFACTURER’S DATA AND TECHNICAL INFORMATION • Proprietary systems used • Independent fire test of all rated assemblies • Damper installation instructions for each type installed (U.L. approved) • Duct smoke detector installation instructions

  16. ARCHITECTURAL • Separation between construction and occupied areas (ICRA compliance) • Exits • Fire/Smoke walls • Fire rated assemblies • Steel fireproofing • Stairs and handrails clearances/tread-riser • Fire Stopping/Draft Stopping • Access panels both sides of smoke/rated barriers • Door frames UL labels • Room Sizes • Windows/Views • Scuppers or auxiliary drains

  17. MECHANICAL • Plumbing rough-in (wall hung lavatory carriers) • Sleeves for pipes and ducts through rated walls • Sprinkler piping • Mechanical equipment location • Mechanical rooms • Fire pump room • Grease duct location • Medical gas piping rough-in • Damper installations

  18. ELECTRICAL • Normal main service switchgear • Rough-in of bulk conduits • Panel board locations • Generator, transfer switches, transformer locations • Exit lighting • Receptacle requirement locations • Lightning protection • Wiring • Access panels • Grounding (main /equipotential /lightning)

  19. ELECTRICAL • Outdoor egress lighting locations and circuiting • Location of fire alarm devices • Location of nurse call/code blue devices • Emergency generator requirements for final survey

  20. AHCA FINAL SURVEY

  21. NOT READY

  22. NOT READY

  23. READY

  24. PERSONNEL WHO MAY BE PRESENT AT SITE • Project architect • Project engineers (MEP) • Project manager • Superintendent • Drywall contractor • Mechanical contractor • Electrical contractor • Owner or owner’s representative (at least at the exit interview) • Laborers to move ladders, equipment, etc. • Fire alarm contractor • Nurse call contractor • Sprinkler contractor • Generator or special emergency power contractor

  25. EQUIPMENT • Ladders—at least one for each discipline (large projects may require more) • Flat head and Philips screwdriver, pliers or wrench, drywall saw etc. • Flashlight (for owner’s representative) • Two-way radios for each discipline tuned to the same frequency (for large projects) • Table and chairs at a pre-selected area for plan-review, conference and exit interview

  26. PAPERWORK • Set of construction documents approved by AHCA • Sprinkler working drawings approved by AHCA • Life safety plan (preferably reduced for convenient use) • Outstanding AHCA plan review comments • All AHCA approval letters • All correspondence from AHCA • All change orders and field orders • Previous AHCA construction survey letters • Emergency evacuation plan • Fire exit drill plan • Documentation showing Sprinkler system checked • Documentation showing smoke detectors were tested in place

  27. MANUFACTURER’S DATA AND TECHNICAL INFORMATION • Proprietary systems used • Independent fire test of all rated assemblies • Damper installation instructions for each type installed (U.L. approved) • Duct smoke detector installation instructions • Rated lay-in ceiling instructions • Electrical panels, switchboards, transformers, equipment instructions

  28. ARCHITECTURAL • Fire/Smoke walls signage • Access panels in hard ceiling areas to witness rated wall signage • Fire rated assemblies penetrations • Door opening force (Accessibility and Life Safety) • Life Safety automatic door operation • Life Safety path of egress issues • Accessible routes (widths, handrails, ramps, cross slopes, protruding objects, wheelchair spaces, counter, transitions) • Accessible restrooms • Cubicle curtain track suspension from structure • Hurricane emergency preparedness manual • Beds/Service addition memo • As-built document submission process (final Life Safety Sheet)

  29. FIRE/SMOKE RATED THROUGH PENETRATIONS

  30. EXCESSIVE USE OF THROUGH PENETRATION FIRESTOP

  31. FUNCTIONAL CHANGES

  32. ARCHITECTURAL CERTIFICATIONS • Flame spread ratings for paint and vinyl wall coverings • Flame spread ratings for vinyl flooring, acoustical tile and building insulation • Flame resistant bedding • Flame resistant lumber • Flame resistant draperies and cubicle curtains • Critical radiant flux ratings for carpet • State elevator certificate • Spray-on fireproofing on steel • Rated concrete masonry unit certification • NOA or PA documents (marked)

  33. MECHANICAL • Functioning fire/smoke dampers, exhaust fans, and air-handling units during fire alarm activation • Functioning HVAC system, chillers, refrigerant leak test, purge exhaust fan and alarm detection • Functioning duct smoke detector, pressure differential test • Roof top mounted or exterior equipment protection, clearances • Signage, labels on devices, equipment, piping, UL labels • Functioning sprinkler system (flow and tamper test) • Functioning fire pump system

  34. MECHANICAL • Functioning kitchen hood, laboratory hood, pharmacy hood, exhaust systems, extinguishing system • Thermal insulation on piping • Isolation of different metals • Functioning medical gas system

  35. ELECTRICAL • Load bank & NFPA-110 test reports for emergency generator (if applicable) • Isolation panel certified test reports (if applicable) • Sensitivity test reports for smoke & duct detectors • Updated panel board schedules for all panels • Circuit testing in project areas • Correct labeling on panels, disconnect switches, panel boards etc. • Engraved ID on receptacles/switches in patient care • Adequate lighting levels and circuiting in project area

  36. SYSTEMS CHECK TO BE COMPLETED PRIOR AND DURING AHCA SURVEY • Fire alarm and third party tie-in & certification • Fire protection systems tests • Nurse call and code blue & certification • Medical gas system test • Dry or wet chemical suppression tests • Kitchen equipment start-up • HVAC system start-up • Equipotential grounding in patient care areas • Lighting protection certification

  37. Meet Brian Before the Inspection

  38. BRIAN AFTER THE INSPECTION

  39. The Built Environment: Passing Inspections First Time & Every Time

  40. BETTER HEALTH CARE FOR ALL FLORIDIANS