1 / 6

LHCb T2D sites

LHCb T2D sites. A.Tsaregorodtsev, CPPM. Why T2D sites for LHCb. The T2D concept introduced in 2013 to allow non-T1 country sites to controbute storage to LHCb To allow well established T2 sites to contribute to the LHCb analysis activities The project is in a prototype state yet

Download Presentation

LHCb T2D sites

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb T2D sites A.Tsaregorodtsev, CPPM

  2. Why T2D sites for LHCb • The T2D concept introduced in 2013 • to allow non-T1 country sites to controbute storage to LHCb • To allow well established T2 sites to contribute to the LHCb analysis activities • The project is in a prototype state yet • 5 sites being tested • Incorporation into the LHCb production system • Monitoring, performance evaluation • Contacts • Based on initial testing a ( final ) draft of the LHCb T2D document is prepared • T2D site qualification criteria • Monitoring and performance • Support structures

  3. T2D qualification • Successful T2 sites with availability >95% in the last quarter • Storage system configured and tested as part of the LHCb data management procedure • Contact person is nominated • Not necessarily LHCb member • In contact with the national NCB representative • Adhere to the WLCG MoU requirement to respond to analysis problems ( 2 hours ). • Storage requirement • Minimum 100 TB to start with • Increase to 300 TB in the next year • LHCb-Disk space token • Connected to the LHCb FTS3 service • Support for xrootd with a fixed xrootd endpoint, SRM configured to return xrootd TURL

  4. T2D qualification • CPU requirement • 5 HEPSPEC’06 per TB of storage available to LHCb • 1.5 kHEPSPEC’06 for 300TB • Network connectivity • At least 1 Gbit/s to the national NREN • The T2D sites are available for analysis to all the LHCb users

  5. T2D sites monitoring • LHCb TWiKi T2D Comissioning page will be set up to monitor the site performance • https://twiki.cern.ch/twiki/bin/view/LHCb/T2DCommissioning • Sites will be requires to achieve 95% availability according to the WLCG T2 MoU criteria • If not achieved for a quarter in a row, site should provide a work plan to fix the issues or its T2D status can be revoked • The T2D sites will participate in the LHCb perfSonar monitoring • The site monitoring results will be published in the LHCb Site Status Board dashboard

  6. Support • LHCb will nominate T2 coordinator • Connection between T2D sites and the operations team • Monitoring pages to show sites their performance • LHCb Internal log book for T2D site operations • Dedicated mailing list for T2D sites and candidates • Monthly video/audio conferences for T2 sites

More Related