VIEWS ON ACCESS REFORM Phil Baker 2 February 2007

VIEWS ON ACCESS REFORM Phil Baker 2 February 2007. Priorities. Minimise grid access-related barriers to the deployment of renewables Maximise the utilisation of network assets, both transmission & distribution Maintain the reliability & integrity of the electricity networks.

melita
Download Presentation

VIEWS ON ACCESS REFORM Phil Baker 2 February 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VIEWS ON ACCESS REFORM Phil Baker 2 February 2007

  2. Priorities • Minimise grid access-related barriers to the deployment of renewables • Maximise the utilisation of network assets, both transmission & distribution • Maintain the reliability & integrity of the electricity networks

  3. Government Targets (1) • Likely to require up to 10GW of wind generation to meet 2010 target • need about 6GW in Scotland? • Potential shortfall - could be larger than necessary • Need to resolve queue issues and ensure that • projects able to proceed are allowed to do so • access reallocated in time • anticipate queue attrition?

  4. Government Targets (2) • Require around 20GW of connections to meet 2020 aspiration – a significant challenge • Need to maximise the utilisation of available transmission capacity • Can existing arrangements cope?

  5. Maximise Use of Available Capacity • Work by Centre for DG & SE concluded that; • different technologies drive transmission investment differently • conventional & renewable generation should share available transmission capacity • Centre’s work also points to • lower transmission charges for wind • difficulties with the current arrangements in terms of TEC • need for additional short term products and information to allow increased utilisation of available capacity

  6. Beyond 2010 • 20GW of renewable generation implies notional plant margin of approx: 50% • Sharing available transmission capacity seems inevitable. • Existing access methodology (TEC) at odds with concept of sharing capacity? • Need for mechanisms that allow more generation to connect and share access • trading mechanisms? • administered solution? • Whatever we do, need for a transparent process that gives confidence to both existing and new players

  7. Need to Develop Consensus on Way Forward • DTI working closely with Ofgem and the GBSO • Good to see ARODG in action again • Good to see industry coming forward with proposals