1 / 5

Data used at CWU Power Resourcing Meeting Keybridge House 22/02/2012

Data used at CWU Power Resourcing Meeting Keybridge House 22/02/2012. Slide 1 Total A56 Programme 2012-13 Slide 2 A56 Profile over year showing Peaks and Troughs Slide 3 ABN Resource profile for 2012-13 all Power Workstreams Slide 4 ABS Resource profile for 2012-13 all Power Workstreams.

Download Presentation

Data used at CWU Power Resourcing Meeting Keybridge House 22/02/2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data used at CWU Power Resourcing MeetingKeybridge House 22/02/2012 Slide 1 Total A56 Programme 2012-13 Slide 2 A56 Profile over year showing Peaks and Troughs Slide 3 ABN Resource profile for 2012-13 all Power Workstreams Slide 4 ABS Resource profile for 2012-13 all Power Workstreams

  2. A56 Programme 2012-13 • A56 total GIFA 1010393 • AB budget is for 404000 GIFA , actual AB GIFA 407746 • To resource in full would take 40% of available resource • Sites given to 3rd Party are either areas of resource shortage or long duration sites

  3. A56 Profile • A56 Profile for 2012-13 for ABN & ABS • Sample ABN2 shows the peaks we have to cope with

More Related