1 / 12

Endcap Systemtest

Endcap Systemtest. Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules Basic performance First tries at noise injection Plans. Three Grounding Schemes. All 3 schemes have: continuous shielding VME crate to Cu sector enclosure,

mendel
Download Presentation

Endcap Systemtest

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Endcap Systemtest • Current Grounding/Shielding status • Recent Upgrades to sector • Measurements with 6 Modules • Basic performance • First tries at noise injection • Plans J.Pater - Systemtest Report

  2. Three Grounding Schemes • All 3 schemes have: • continuous shielding VME crate to Cu sector enclosure, • (~) all power lines AC connected to shield at PPF1, • system of interconnected foil rings on disk face. • Differences: • “Shunt Shields In” • Built-in shunt shields on module + isolation layer on cooling block • all modules’ DGNDs connected to shield at PPF0 • “Shunt Shields (~) Shorted” • Shunt shields still there but electrically bypassed • DGNDs not connected at PP0 • “Doubleshort” • Shunt shields ‘shorted’ • DGNDs connected together at PPF0 • All 3 schemes perform equally well with no noise injected J.Pater - Systemtest Report

  3. Measurements with 3 Modules J.Pater - Systemtest Report

  4. “Shunt shields in” (black) vs. “Shunt shields shorted” (red) “DoubleShort” scheme (Note different vertical scale) Injection onto Tapes J.Pater - Systemtest Report

  5. “Shunt shields in” (black) vs. “Shunt shields shorted” (red) “DoubleShort” scheme (Note different vertical scale) Injection onto Pipes J.Pater - Systemtest Report

  6. Ground Scheme Comparison with3 outer modules: Summary • A hybrid G&S scheme seems to work to best against injected noise: • Short around shunt shields i.e. DC-connect all GNDs together at cooling circuit • Also connect all DGNDs together at PPF0 • NB this is based on one measurement; needs verification. J.Pater - Systemtest Report

  7. July/Aug: Upgrades to System • Now can simultaneously read out 6 modules of different types • Many problems with connectorised power tapes and Molex patch panels • Shielding improvements: • Added missing filtering caps at PPF1 (Vdd-shield, Vcc-shield) • Improved screening of 50m tapes • Added Cu sheet PPF1-thermal enclosure; used to improve interconnection of cable shielding J.Pater - Systemtest Report

  8. 6 Modules on Sector Position O11 not working Back of disk: one module in position M10 J.Pater - Systemtest Report

  9. 6-Module Run, no noise injection Blue = in test box at institute Yellow = alone on sector Purple = 6-module run J.Pater - Systemtest Report

  10. 6 Modules, noise injection onto cooling pipes (shunt shields in) • Little or no pickup on inner and middle modules • More pickup on outer modules than before • Not understood, but… • … electrical connection of cooling pipes to outside world is not well simulated in systemtest – needs improvement J.Pater - Systemtest Report

  11. 6 Modules, noise injection onto power tapes (shunt shields in) • Injected similar signal as in 3-module case • no pickup seen (!) • Injected MORE • very little pickup seen (see plot to right ) • Recall grounding/shielding improvements: • more filtering at PPF1 • better shielding and connections between PPF1 and sector box • Recent work suggests that the solidity of the electrical connection between PPF1 and the thermal enclosure is crucial. J.Pater - Systemtest Report

  12. Near-future Plans • Upgrades: as soon as is practical: • Make cooling pipes’ exit from thermal enclosure more realistic • Install new on-disk tapes, PPF0s • (provided initial tests show satisfactory performance) • Repeat injection with all 3 G&S schemes • To verify previous observations with outer modules • To see what happens with middles and inners • If “doubleshort” scheme still best: • Remove shunt shields from modules to verify that it is not needed. • Address what to do electrically at cooling block. • Check: is pickup ~simply function of proximity to tape? • Test other outer positions, upper and lower • Vary distance silicon-to-tape. Need add-on for cooling block. J.Pater - Systemtest Report

More Related