1 / 9

PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation

PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation. WP 1 content. PERFORMER concept WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment. WP 1 content.

meris
Download Presentation

PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PERFORMER KO MEETINGNICE -12th & 13th September 2013WP1short presentation

  2. WP 1 content • PERFORMER concept • WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment

  3. WP 1 content • OBJECTIVES : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment • Task 1.1 : Define a comprehensive and coherent framework for the global quality process of performance assessment • Definition of a quality process ensuring the monitoring of building energy consumptions and the achievement of targeted performances (based on commissioning) • Definition of appropriate indicators, characterization of the buildings properties, characterization of « in use » conditions • Task 1.2 : Develop methodologies as well simulation models and tools to assess the in situ intrinsic performance of the buildings envelops • Development of a methodology to assess intrinsic performance of the envelope at the end of the construction during a short period • Development of a methodology to assess intrinsic performance of the envelope using long term monitoring during operation phase • Task 1.3 : Develop methodologies to propose a cost optimized measurement assessment plan • Specification for a tool aiming at providing cost-optimized energy performance measurement plan enable to support PERFORMER solutions • Task 1.4 : methodologies for energy management, fault detection and diagnosis • Specifications for a set of relevant tools to manage energy consumption and ensure continuity of the performances during the operation phase • Fault detection and diagnosis, performance monitoring, real time management and optimized control, visualization and reporting tools

  4. WP 1 content • Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment

  5. WP 1 content • Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment Person-months per participant

  6. WP 1 content • Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment Person-months per participant

  7. Dependencies & Dependents for WP1 • WP1/WP2 • A high level of interaction isrequired in order to ensure the transfer of the methodologies to WP2 • Proposition to provideintermediatedeliverables for WP2 • WP1/WP3&4 • WP1 has to support WP3 for the deployment of the PERFORMER methodologies on demonstrators • (indicators for perfromanceassessment, characterization of the building and « in use » conditions and occupant’sbehavior) • WP1/WP5 • WP1 has to provide relevant inputs for WP5, in particulargeneralprinciplesreplicable for the development of a business model for the exploitation of the PERFORMER solution Intermediate deliverable for WP2

  8. WP1 implementation plan for first 6 months • For the first 6 months, main stakes are : • Task 1.1 (Global Framework - T0 ->T0+12) : • Interactwith WP3 in order to ensure the consistencywith PERFORMER demonstrators • Ensure to provide a « europeanview » required for a replicationstrategy (WP5) • Fiststep : All participants send to CSTB contribution about state of art • Task 1.2 (Intrinsic performance - T0 –> T0+15) : • Develop the 2 PERFORMER methodologies for intrinsic performance assessment • Identify the way of validation (in situ experimentation and/or mockup) • Task 1.3&1.4 (Costoptimizedmeasurement plan and energyconsumption management - T0+5 –> T0+15) • Set up dedicatedwork team for the 4 subtasks, • Identify the PERFORMER scientificmethods(state of art required) • Identify the betterway of interaction with WP2 to transfer the methodologiesdevelopped Asking for 3 months more in order to reinforce the link with WP2? • Interaction withotherWPs: • WP1/WP2 : asking for 3 months more for tasks 1.2,1.3&1.4 in order to reinforce the linkwith WP2

  9. CSTB offers its services to all players in the construction sector to improve the quality and safety of buildings.

More Related