PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation. WP 1 content. PERFORMER concept WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment. WP 1 content.
E N D
PERFORMER KO MEETINGNICE -12th & 13th September 2013WP1short presentation
WP 1 content • PERFORMER concept • WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment
WP 1 content • OBJECTIVES : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment • Task 1.1 : Define a comprehensive and coherent framework for the global quality process of performance assessment • Definition of a quality process ensuring the monitoring of building energy consumptions and the achievement of targeted performances (based on commissioning) • Definition of appropriate indicators, characterization of the buildings properties, characterization of « in use » conditions • Task 1.2 : Develop methodologies as well simulation models and tools to assess the in situ intrinsic performance of the buildings envelops • Development of a methodology to assess intrinsic performance of the envelope at the end of the construction during a short period • Development of a methodology to assess intrinsic performance of the envelope using long term monitoring during operation phase • Task 1.3 : Develop methodologies to propose a cost optimized measurement assessment plan • Specification for a tool aiming at providing cost-optimized energy performance measurement plan enable to support PERFORMER solutions • Task 1.4 : methodologies for energy management, fault detection and diagnosis • Specifications for a set of relevant tools to manage energy consumption and ensure continuity of the performances during the operation phase • Fault detection and diagnosis, performance monitoring, real time management and optimized control, visualization and reporting tools
WP 1 content • Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment
WP 1 content • Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment Person-months per participant
WP 1 content • Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment Person-months per participant
Dependencies & Dependents for WP1 • WP1/WP2 • A high level of interaction isrequired in order to ensure the transfer of the methodologies to WP2 • Proposition to provideintermediatedeliverables for WP2 • WP1/WP3&4 • WP1 has to support WP3 for the deployment of the PERFORMER methodologies on demonstrators • (indicators for perfromanceassessment, characterization of the building and « in use » conditions and occupant’sbehavior) • WP1/WP5 • WP1 has to provide relevant inputs for WP5, in particulargeneralprinciplesreplicable for the development of a business model for the exploitation of the PERFORMER solution Intermediate deliverable for WP2
WP1 implementation plan for first 6 months • For the first 6 months, main stakes are : • Task 1.1 (Global Framework - T0 ->T0+12) : • Interactwith WP3 in order to ensure the consistencywith PERFORMER demonstrators • Ensure to provide a « europeanview » required for a replicationstrategy (WP5) • Fiststep : All participants send to CSTB contribution about state of art • Task 1.2 (Intrinsic performance - T0 –> T0+15) : • Develop the 2 PERFORMER methodologies for intrinsic performance assessment • Identify the way of validation (in situ experimentation and/or mockup) • Task 1.3&1.4 (Costoptimizedmeasurement plan and energyconsumption management - T0+5 –> T0+15) • Set up dedicatedwork team for the 4 subtasks, • Identify the PERFORMER scientificmethods(state of art required) • Identify the betterway of interaction with WP2 to transfer the methodologiesdevelopped Asking for 3 months more in order to reinforce the link with WP2? • Interaction withotherWPs: • WP1/WP2 : asking for 3 months more for tasks 1.2,1.3&1.4 in order to reinforce the linkwith WP2