1 / 13

CACT HZ21-1 Field Water Shut Off Application2003 Review

Introduction. HZ 211 field is a Multi-layer oil and gas field in the northeast of CACT's Block 16/08. The field was discovered in 1985 and started production Sep 1990. It was the first field on production in the Pearl River Mouth Basin. As at Oct 2003, cumulative reached to 52.8 MM or 37.2% of an es

merle
Download Presentation

CACT HZ21-1 Field Water Shut Off Application2003 Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. CACT HZ21-1 Field Water Shut Off Application(2003) Review TianXiang

More Related