An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation by RongliGeng (JLab) at ILC/S0 Meeting 9 November 2010

  2. Initial power rise After re-HPR TB9RI28 • Two EP runs necessary for needed bulk removal (due to removal meter issue). • First RF test 22 MV/m, limited by strong field emission (amid temporary field emission issue related to facility). • RI28 re-test after re-HPR 6x (complete dis-assm with hardware swap), successful FE reduction, some FE at initial power rise, almost no FE at final power rise, 38.8 MV/m at Q0 1.4E10, limited by quench. Pi mode freq 2K under vacuum 1299.854 MHz; Pi mode FF 96.5% prior to final EP. • Cavity already shipped back to FNAL. final power rise After re-HPR

  3. RongliGeng 10.November 2010: As you can see, 1mR/h was recorded at 38.8 MV/m during final power rise. This level if radiation is benign by JLAB VTA standard. My advice is that no re-HPR is necessary  in terms of  the cavity surface cleanliness as is.