30 likes | 199 Views
NIAPS v2.4 Installation Plan by Hull in 2012 (Based on Ship’s Availabilities Scheduled in NDE and Coordination with TYCOM for Pier Side WOOs). Legend. v2.4 Test Ships. - Ship Change Document Approval - Alts scheduled in NDE PPL/SSIL Certification Interoperability Certification
E N D
NIAPS v2.4 Installation Plan by Hull in 2012(Based on Ship’s Availabilities Scheduled in NDE and Coordination with TYCOM for Pier Side WOOs) Legend v2.4 Test Ships • - Ship Change Document Approval • - Alts scheduled in NDE • PPL/SSIL Certification • Interoperability Certification • Training Certification • ILS Certification • ATO Approval • System Admin Guide (Final Issue) • Developmental Testing • Pre-CANES Block One Testing Availabilities scheduled in NDE for v2.4 upgrade P = PAC Ship L = LANT Ship Remaining v2.4 Testing • March Operational System Tests (OST) or “Proof-ins” are in progress as of 12 March. v2.4 OST
NIAPS v2.4 Installation Plan by Hull in 2012 (Based on Ship’s Availabilities Scheduled in NDE and Coordination with TYCOM for Pier Side WOOs) Legend Availabilities scheduled in NDE for v2.4 upgrade P = PAC Ship L = LANT Ship AITs are for Pre-CANES Platforms = LANT Ship
NIAPS v2.4 Installation Plan by Hull in 2012 (Based on Ship’s Availabilities Scheduled in NDE and Coordination with TYCOMs for Pier Side WOOs) AITs are for Pre-CANES Platforms = LANT Ship Will coordinate with TYCOMs to identify a pier side WOO for v2.4 installation in 2012 Availabilities scheduled in NDE for v2.4 upgrade L = LANT Ship P = PAC Ship