1 / 9

Machine All Hands meeting 2018-10-26

Learn about ESS's organization for Installation, optimizing schedules, maintaining quality standards, and enhancing rigging support services.

michaely
Download Presentation

Machine All Hands meeting 2018-10-26

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Machine All Hands meeting2018-10-26 Kristofer Falkland

  2. Installation Support & TechnicalInfrastructure In order to manage Installation, ESS has put in place an organization that coordinates the work of the different subprojects, continuously optimize the installation schedule of the ESS facility in view of meeting the main project milestones as cost effectively as possible and making sure that the work is done in line with the ESS way of working, in a safe and efficient way, and meeting our quality standards Installation Support & TechnicalInfrastructure

  3. Installation Support & TechnicalInfrastructure In order to manage Installation, ESS has put in place an organization that coordinates the work of the different subprojects, continuously optimize the installation schedule of the ESS facility in view of meeting the main project milestones as cost effectively as possible and making sure that the work is done in line with the ESS way of working, in a safe and efficient way, and meeting our quality standards Joint effort Templates Process Development Reviews (IRR) Installation procedures Standardization (WoW) Installation Support & TechnicalInfrastructure

  4. Installation Support & TechnicalInfrastructure In order to manage Installation, ESS has put in place an organization that coordinates the work of the different subprojects, continuously optimize the installation schedule of the ESS facility in view of meeting the main project milestones as cost effectively as possible and making sure that the work is done in line with the ESS way of working, in a safe and efficient way, and meeting our quality standards Joint effort Templates Process Development Reviews (IRR) Installation procedures Standardization (WoW) Installation Support & TechnicalInfrastructure Facilitateframeworkagreements Support Installation Definedscopeofwork Rigging Support withelectrical & mechanicalresources -Mechanical -Electrical

  5. Installation Support & TechnicalInfrastructure • Main purpose is to have a in-house ”know-how” • High focus on safety while working with rigging/lifting • Economic and time saving.

  6. Installation Support & TechnicalInfrastructure More than 40 years experience in rigging available to support you with: • Perform rigging and lifting operations on site • Purchase, inspect and maintain lifting equipment. • Facilitates the rigging frameworks. • Consult regarding lifting/rigging, already in design phase. Consult Henrik Mårtensson or file a ticket: ESSnow Rigging

  7. Installation Support & TechnicalInfrastructure Status today… ESS DG (ESS-EL) Eldriftledare ESS Pär-Åke Svensson (EOL-ESS) (ESS-0328313) Off-site Facilities Eldriftledare SEC Per Smidfelt (EOL-SEC)(ESS-0402474) Eldriftledare Facility Pär-Åke Svensson (EOL-Facility)(ESS-0328308) Eldriftledare AD Owen Buchan(EOL-AD)(ESS-0402473) Eldriftledare Facility HV Pär-Åke Svensson (EOL-Facility 1)(ESS-0402714 ) Eldriftledare Facility LV Jan Lundgren(EOL-Facility 2)(ESS-0402715)

  8. TemporaryTechnical Center After more than 1 year of planning and preparation… ESS is now only days away from having it’s own on-site central mechanical workshop! TTC Start-up services include: • Manual drilling, milling and turning • Material cutting • Light MIG and TIG welding (Mid-Nov) • Large Stock of fastenersin A4 stainless steel from M2-M24 • Stock of common Bosch/Rexrothprofile and components

  9. TemporaryTechnical Center All of these new TTC services are in addition to: • FDM 3D printing – which recently expanded to include a new Ultimaker S5 • Support and coordination of outsourcing manufacturing jobs to local vendors Feel free to send any questions to Benjamin.Davidge@esss.se or call on +46 (0)72 179 2347 For all job requests please file a Manufacturing request on our confluence page We are here to assist all of you with your manufacturing related needs!

More Related