1 / 3

TECHNICAL OPERATION SUBCOMMITTEE

TECHNICAL OPERATION SUBCOMMITTEE. Report to Operating Committee June 10 – June 11 2004 Gary S. Tarplee - Chair. Progress on 2004 TOS Goals. Complete generator “Automatic Voltage Regulator (AVR) Policy”. Completed Complete Power System Stabilizer Design and Performance Criteria”. Completed

dreama
Download Presentation

TECHNICAL OPERATION SUBCOMMITTEE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TECHNICAL OPERATION SUBCOMMITTEE Report to Operating Committee June 10 – June 11 2004 Gary S. Tarplee - Chair

  2. Progress on 2004 TOS Goals • Complete generator “Automatic Voltage Regulator (AVR) Policy”. • Completed • Complete Power System Stabilizer Design and Performance Criteria”. • Completed • Complete review of 2002-2003 Disturbance Reports. • 60% complete • Update the following guidelines: • “Guidelines for Time Synchronization of Protection, Control and Monitoring”. • “Underfrequency Load Shedding Relay Application Guide”. • Both have completed due process. • Both will seek approval at October’s OC meeting.

  3. OC Approval Items • “Automatic Voltage Regulator Policy Statement”. • Requires AVRs on all synchronous generators. • 30 MVA and above new or existing units that are replacing their exciter shall be required to have high initial response excitation systems. • AVR equipment shall be tested and calibrated in conjunction with the balance of the excitation system as often as necessary, but no less frequently than required by NERC/WECC Standards. • Outlines minimum performance requirements. • Completed due process and approved by TOS.

More Related