1 / 3

CCSDS Security Working Group Fall 2008 Meeting 15-16 October 2008 Berlin Germany

CCSDS Security Working Group Fall 2008 Meeting 15-16 October 2008 Berlin Germany. AGENDA. 13 October 2008 08:00 – 09:00 : CCSDS Plenary 09:00 – 12:00 : Systems Engineering Area (SEA) Plenary 14 October 2008 (09:00 – 12:00) Space Data Link Layer Security BOF 15 October 2008 (09:00 – 17:00)

michon
Download Presentation

CCSDS Security Working Group Fall 2008 Meeting 15-16 October 2008 Berlin Germany

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CCSDS Security Working GroupFall 2008 Meeting15-16 October 2008Berlin Germany

  2. AGENDA • 13 October 2008 • 08:00 – 09:00: CCSDS Plenary • 09:00 – 12:00: Systems Engineering Area (SEA) Plenary • 14 October 2008 (09:00 – 12:00) • Space Data Link Layer Security BOF • 15 October 2008 (09:00 – 17:00) • Welcome, opening remarks, logistics, agenda bashing, introduction for new attendees + Review of document progress and results of Spring 2008 meeting • Document Status (encryption, authentication, key management, mission planners) • “Big Picture” discussions (Black) • 1200-1300: Lunch • Security Architecture Document Discussions (Black) • Mission Planner’s Guide (Biggerstaff) • 16 October 2008 (09:00 – 17:00) • Key Management (Fischer) • Application Layer Security (Pajevski/Weiss) • 1200-1300: Lunch • Other discussions (from last meeting): • “Color” of books (magenta vs. blue) • Encryption & authentication application-specific parameters • Common Criteria for mission security profiles (knit docs together) • Agency security implementations (approach, requirements, security services) • Meeting with DTN BOF (tentative) • 17 October 2008 • 1300-1700: SEA Wrap-up Plenary

  3. Status • Washington (March 2008) Progress: • Discussed SecWG Security Architecture comments. Most resolved. Discussed possibility of adding link layer security. BSNC will revise for next meeting. • Discussed authentication document and added GMAC (should) and CMAC (may). • Met with SM&C – gave thumbs up to their security architecture. • Discussed CFDP and application layer security in general. • Reviewed Key Management Green and Magenta docs • Reviewed Mission Planners Security Guide draft • Reviewed the status of SCPS-SP (and its flaw) – decided not to repair and resurrect it. • Discussed and tabled the use of the Common Criteria for mission security profiles • Held joint mtg w/SLS to being a Space Link Layer Security BOF • Current Progress: • Held interim telecon June 4, 2008 • Security sections written for both Encryption and Authentication docs. Reversed RSA DSA for dig signature. • Both docs forwarded to Secretariat for editing • Encryption doc out for “pre-review” review • Revised version of Security Architecture distributed for WG comments

More Related