1 / 7

Revision to the AASHTO Guide for the Development of Bicycle Facilities

Revision to the AASHTO Guide for the Development of Bicycle Facilities. Presentation to Joint SCOTE/TCONMT Committees John LaPlante, P.E., P.T.O.E. June 19, 2007. NCHRP Project 15-37. Chair of NCHRP Panel – Dwight Kingsbury, Florida DOT Panel includes: 7 members from State DOTs

mickey
Download Presentation

Revision to the AASHTO Guide for the Development of Bicycle Facilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Revision to the AASHTO Guide for the Development of Bicycle Facilities Presentation to Joint SCOTE/TCONMT Committees John LaPlante, P.E., P.T.O.E. June 19, 2007

  2. NCHRP Project 15-37 • Chair of NCHRP Panel – Dwight Kingsbury, Florida DOT • Panel includes: • 7 members from State DOTs • 2 FHWA representatives • 1 member from a university • 1 member from a local agency • 1 consultant • Chris Hedges – NCHRP staff in charge • Jennifer Toole, Toole Design Group - Principal Investigator

  3. Project Team

  4. Project Timeline • Draft outline complete – November 2007 • Updates to AASHTO/TRB Committees – Winter 2008 • First draft to NCHRP Panel – May 2008 • Draft anticipated for wider review – Fall 2008 • Completion – March 2009

  5. Stakeholder Involvement • Regular updates to Three AASHTO Committees: • Technical Committee on Non-Motorized Transportation • Subcommittee on Traffic Engineering • Technical Committee on Geometric Design • TRB Bicycle Committee • NCUTCD Bicycle Technical Committee • State DOT Representatives • State Highway Engineer • State Traffic Engineer • Rep from Statewide Planning • Bicycle Coordinator • Key Local Agency Representatives

  6. Some Issues for the Next Guide • Update bicycle planning based on new research • Facility selection/bikeway designation meaning/value • Guidance on retrofitting existing rights-of-way • Better lane width guidance • Use of the shared lane marking with and w/o parking • More guidance on bike lane design at intersections • Guidance on path/roadway intersection design (bollards) • Revise signalization formulas based on new research • Suitability and appropriate design of sidepaths • Urban vs. rural shared lane design issues • Bicycle parking and transit interface • Work zones and bikeway detours Others?

  7. Thank you! Contact information: Jennifer Toole Toole Design Group jtoole@tooledesign.com John LaPlante TY Lin International jlaplante@tylin.com