Problems still to be addressed. Meet full specification on all parameters e.g. - full voltages - bias on tune throughout - amplitude control - clean RF waveforms - control through ISIS LPRF Demonstrate reliable running for about 1 week Automatic cavity tuning via
E N D
Problems still to be addressed Meet full specification on all parameters e.g. - full voltages - bias on tune throughout - amplitude control - clean RF waveforms - control through ISIS LPRF Demonstrate reliable running for about 1 week Automatic cavity tuning via - phase of input/output voltages - or phase of output grid/gap voltages - or phase of output RF current/gap volts
Gap volts and output RF current are available on the mezzanine in R5.4, but neet to be available in the Diagnostics Room at System 6 2RF LPRF Pipework for cavity cooling is unreliable and should be replaced with something better Derek estimates about 2 weeks’ experimental time plus at least a week’s soak testing before we could make a convincing case to run into ISIS synchrotron SP6