70 likes | 184 Views
WEL – COME S. J. Iron & Steels Pvt. Ltd . Area – 3 Acres Manpower of company – 325 nos. Turnover - 40 Cr. (Target 55 Cr. For 2011-2012). Name of Quality Circle – PRAKASH QUALITY CIRCLE Name of the members
E N D
WEL – COMES. J. Iron & Steels Pvt. Ltd. Area – 3 Acres Manpower of company – 325 nos. Turnover - 40 Cr. (Target 55 Cr. For 2011-2012)
Name of Quality Circle – PRAKASH QUALITY CIRCLE • Name of the members 1)Mr. P.B. MALI– Co-ordinator 2) Mr.V.D.RAVAN- Facilitator
DATA COLLECTION FOR FOUNDRY DEPARTMENTS • MEETING NO -2 DATE-31/10/2011 1 AIR LEAKAGES REMOVING . 2 SAND LEAKAGES REMOVING . 3 OIL LEAKAGES REMOVING 4 SAND COLLER WORK MAKING OK CANDITION. 5 SAND MIXAR (KELSON MAKE) WORK . 6 PREPAID SAND CONVEYER( NO 3) BELT CHUTE MODIFICTIONG. 7 ARRITER FITING ON PREPAID SAND CONVEYER( NO 2) BELT. 8 FRESH SAND BELT NEW CHUTE MAKING AND SAND SPILELAGE STOPING WORK. 9 COMPAX MACHIN ‘D’CLAMP SPEED PROPER WORK. 10 AUTO LINE CAR MOTOR SAFTY COVER FEETING. 11 HOT ROOM BURNER WORK.
DATA COLLECTION FOR FOUNDRY DEPARTMENTS • MEETING NO - 3 DATE-14/11/2011 1COMPAX MACHIN AMINE PUMP WORK. 2 CUPOLA SKIP CHARGER B/D MINIMIZING. 3 CUPOLA WIRE ROPE PROBLEM REMOVING. 4 MM 1 & 2 TRANSFER TROLLEY NEW MAKEING. 5 LADDLE PREHEATER PROBLEM REMOVING. 6 MAKING NEW WALL NEAR THE PUMP HOUSE IN THE STOP DUST PARTICALS. 7 CUPOLA COOLING RETURNE WATER CHEMBER PROBLEM REMOVING. 8 MAKING NEW DUST COLLECTING DUCTING PIPEING (SAND COOLER). 9 SANDPLANT MOTOR AND GEAR BOX REPARING. 10 PUMP HOUSE PUMP GLAND CHEKING . 11 F/C HIGH TEMPRECHER PROBLEM REMOVING.
DATA COLLECTION FOR FOUNDRY DEPARTMENTS • MEETING NO-3 DATE-14/11/2011 • FROM SUGGESTIONS OF MEETING NO 2&3 SELECTED BY • AIR LEAKAGES REMOVING PROJECT
DATA COLLECTION FOR AIR LEAKAGES • MEE TING NO .-4 DATE - 21.11.2011 • AIR LEAKAGES POINT DATA COLLECT • GRAND MASTER M/C AIR LEAKAGES :- • 1.SM