1 / 9

Matt Hunsaker Variable Generation Subcommittee

Matt Hunsaker Variable Generation Subcommittee. ISAS Meeting January 12, 2012 Salt Lake City, UT. New VGS Chair. JT Thompson (Constellation Energy) Ty Bettis remains Vice-Chair. OC Areas of Focus. Maximum VG penetration issues Operating reserve requirements Flexibility requirements

miller
Download Presentation

Matt Hunsaker Variable Generation Subcommittee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Matt HunsakerVariable Generation Subcommittee ISAS Meeting January 12, 2012 Salt Lake City, UT

  2. New VGS Chair • JT Thompson (Constellation Energy) • Ty Bettis remains Vice-Chair

  3. OC Areas of Focus • Maximum VG penetration issues • Operating reserve requirements • Flexibility requirements • Standard interconnection requirements

  4. OC Areas of Focus • VGS needs to have further discussions with OC to flesh out some details on areas of focus • One option: use available funding to contractor out studies • Drafting scopes of work

  5. Operating Reserve Requirements • Goal: Recommend methodology for assessing VG reserve requirements • Will work with NREL to validate the reserve requirement methodologies • NREL is developing a new model: • Flexible Energy Scheduling Tool for Integration of Variable Generation (FESTIV)

  6. VG Forecasting Practices • Goal: provide recommendations regarding best practices for central VG forecasting systems • Compiling results of detailed surveys • Effort performed through NREL contracts • Final recommendations expected early Spring

  7. REC Market White Paper • Overview of REC markets/RPS standards and their ramifications on reliability • VGS sought OC input on subsection related to operating concerns and reliability risks • Will be published early 2012

  8. Market Mechanisms to Integrate VG • In 2011 VGS MWG issued a whitepaper on market mechanisms to integrate VG • Will issue a 2012 addendum to provide updates

  9. Questions? Matt Hunsaker Renewable Integration Manager 801-819-7670 mhunsaker@wecc.biz

More Related