1 / 8

FEST

FEST. ECE 477 Fall 2011 TEAM 5 Gloria Budiman Alexander Kidarsa Christopher Sakalis Vishal Gala. fEST. Far End Speakerphone Test System. ABStract. Automated system for testing speakerphones Delivers test signals pre -recorded audio Used to determine time delay

mimi
Download Presentation

FEST

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FEST ECE 477 Fall 2011 TEAM 5 Gloria Budiman Alexander Kidarsa Christopher Sakalis Vishal Gala

  2. fEST • Far • End • Speakerphone • Test • System

  3. ABStract • Automated system for testing speakerphones • Delivers • test signals • pre-recorded audio • Used to determine • time delay • frequency response • signal reproduction quality

  4. PSSC • An ability to play music and rock the house out! • Or not… • Project Specific Success Criteria • It starts from the next slide • Yeah… • Sorry…

  5. PSSC • An ability to measure time delay response between project’s components; the playback device, the telephone line simulator, the DUT which is the speakerphone, and the receiving device. • An ability to determine the frequency response of the DUT. • An ability to “play back” sound files.

  6. PSSC • An ability to record audio and write it to non-volatile (removable) memory. • An ability to perform duplex testing of recording data and playing back data.

  7. fin

More Related