An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MACHC ECC Working Group 1 Report Katie Ries, NOAA

  2. Progress ReportGulf of Honduras 2009 Training LCDR Chris van Westendorp, NOAA Elliott Arroyo, NAVOCEANO

  3. Belize Lessons Learned (Phase 1 Training) • Logistics planning • Vehicle availability • BNCG detainment duties • Equipment Deployment / Control • Troubleshooting methodology

  4. Belize (continued)(Phase 1 Training) • In-survey plan modification • Emergency / safety planning • Coxswain and Hydrographer duties / communication

  5. Honduras:Basic needs for successful program • Vessel dedicated for hydrographic survey • Assigned survey personnel (i.e. electronics technician) • Permanently installed vessel hydrographic equipment • Increased IT proficiency (i.e. basic Microsoft operations) • Coxswain proficiency for driving survey lines • Culture: Basic survey needs and logistics (i.e. not typical office hours) X (Trainer assessment from Phase 1 Training) X

  6. Guatemala:Basic needs for successful program (Trainer assessment from Phase 1 Training) • Vessel dedicated for hydrographic survey • Assigned survey personnel (i.e. electronics technician) • Permanently installed vessel hydrographic equipment • Increased IT proficiency (i.e. basic Microsoft operations) • Coxswain proficiency for driving survey lines • Culture: Basic survey needs and logistics (i.e. not typical office hours) X X X

  7. Plans for Phase 2 Training(All Countries) • Conduct Quality Assurance Checks • Reference from 2009 training • Conduct a Field Hydrographic Survey to IHO Standards • Collect data • Process data • Conduct quality assurance • Be ready/able to transmit survey deliverables to UKHO for chart updates

  8. Customized Phase 2 Training(Belize) • Practice basic surveying principles • Side scan / single beam echosounder acquisition / analysis • Data post-processing • Tides • Calculate tidal datums from time series data & compare with existing vertical control network information • Practice benchmark network establishment / leveling

  9. Customized Phase 2 Training(Honduras) • Practice & Theory: Sidescan Sonar • Operation / data collection / analysis • Target detection & interpretation • Tides • Bottom to top review • Geodesy • Using dual-frequency receiver • Establishing geodetic control point • Linking horizontal / vertical control networks

  10. Customized Phase 2 Training:(Guatemala) • Survey Planning • 100% versus 200% coverage • Harbor versus Approaches • Boat operations & safety • Steering survey lines (coxswain training) • Single beam / side scan sonar acquisition and processing operations • Hypack / Imagenex • Bathymetry & Target analysis / investigation

  11. Action Items… • Travel arrangements communicated to IHO Bureau for Phase 2 training: 30 November 2009 • GoH country representatives participating in NOAA February 2010 Hydrotraining (Belize / Guatemala / Honduras) • 2010 In-country trainers (NOAA/Navy hydrographers) • Honduras: 11-25 April 2010 • Guatemala: 25 April – 9 May 2010 • Belize: 28 February – 14 March 2010

  12. Action items (cont)… • GoH countries identify one (1) English-speaking participant for NOAA February 2010 Hydrotraining: 23 November 2009 • Introductory hydrography course (not for experienced or prior-trained personnel) • NOAA / GoH Project send letter to GoH countries: 11 November 2009 • Invitation to NOAA February 2010 Hydrotraining • Announcement of intent for in-country Phase 2 training

  13. Action items (cont)… • NOAA / Navy explore possibility of focused tide station installation and water level analysis training and/or support: 31 January 2010 • GoH countries ensure preparations made for in-country training: Prior to NOAA/Navy trainer arrival • Vessel & personnel • Equipment installation

  14. Action items (cont)… • GoH countries to document hydrographic activity in-kind contributions using format provided by GoH Project Director: 31 December 2009 • GoH countries produce progress report and results of Phase 1 Training for MACHC Chair to submit to IHO CBC: 31 January 2010

  15. Action items (cont)… • GoH countries and ECC WG1 Chair generate & submit request throuch MACHC Chair for 2011 hydrographic training & support from IHO CBC: 15 March 2010