AP Dept. - Activities Report. 1) SNUMI Phase 1 and Phase 2 civil designs/estimates (status) 2) Offsite reviews; NSF/DUSEL, upcoming LCLS/SLAC 3) SciBooNE Construction 4) Final thoughts on Proton Driver/HINS civil designs - and a comment on AD proposed extension to MI-65 over the proposed
E N D
AP Dept. - Activities Report 1) SNUMI Phase 1 and Phase 2 civil designs/estimates (status) 2) Offsite reviews; NSF/DUSEL, upcoming LCLS/SLAC 3) SciBooNE Construction 4) Final thoughts on Proton Driver/HINS civil designs - and a comment on AD proposed extension to MI-65 over the proposed PD/HINS 8 GeV transfer line location5) Comment on Mu2E as a follow on to SNUMI Phase2 6) Comment on Fermilab to DUSEL neutrino lines Dixon Bogert - AP Dept. Meeting September 20th, 2006 AP Dept. Activities Report September 20, 2006 Dixon Bogert
SNUMI - Phase 1 SNUMI is sometimes referred to as the “McGinnis Plan”. The intention is to increase the power on the NuMI Neutrino target in the assumed absence of the Proton Driver. SNUMI utilizes modifications to existing Fermilab facilities after the completion of collider physics at the end of FY09. SNUMI is planned to occur in two phases. The first phase will use the Recycler Ring to slip stack 12 Booster batches of protons into six slots and then single turn transfer them into the Main Injector. The Main Injector will then spend minimal time at 8 GeV and the Main Injector cycle is reduced to about 1.33 seconds. The power on the NuMI Target will then be about 700 kilowatts. A second injection line from the Booster to FMI 8 GeV line will be constructed for injection into the Recycler, while preserving the existing injection line to the FMI. AP Dept. Activities Report September 20, 2006 Dixon Bogert
SNUMI - Phase 2 AP Dept. Activities Report September 20, 2006 Dixon Bogert
Civil Requirements - SNUMI Phase 1 • MI-14 Kicker Building at MI-10 • MI-39 Kicker Building at MI-40 • 4th Anode Supply Room at MI-60 • Buss Bar Insertion at MI-60 • DOE Space Management Offsets • Cost estimates and construction schedules for above items AP Dept. Activities Report September 20, 2006 Dixon Bogert
Proposed MI-14 Site Near MI-10 As of 9/18/06 AP Dept. Activities Report September 20, 2006 Dixon Bogert
Section thru MI-14 Site Near MI-10 MI-14 As of 9/18/06 AP Dept. Activities Report September 20, 2006 Dixon Bogert
Proposed MI-39 Site Near MI-40 As of 9/18/06 AP Dept. Activities Report September 20, 2006 Dixon Bogert
Section thru MI-39 Site Near MI-40 MI-39 As of 9/18/06 AP Dept. Activities Report September 20, 2006 Dixon Bogert
4th Anode Supply Room Location at MI-60 Possible blast/fire wall is required here. Additional 4-bay switch almost certainly required MI-60 Hi-Bay MI-60 Lo-Bay AP Dept. Activities Report September 20, 2006 Dixon Bogert
Buss Bar Insertion at MI-60 Note interference with roof purlin beam AP Dept. Activities Report September 20, 2006 Dixon Bogert
Civil Requirements - SNUMI Phase 2 • Additional Cooling Pond at MI-60 Ponds A/B • AP-4/AP-5 – Accumulator Connections • Passive Radiation Shielding as possible • DOE Space Management Offsets • Cost estimates and construction schedules for above items AP Dept. Activities Report September 20, 2006 Dixon Bogert
Additional Cooling Pond Location at MI-60 Pond B Pond “X” Pond A MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert
AP-4/AP-5 – Accumulator Connections AP Dept. Activities Report September 20, 2006 Dixon Bogert
Phase 2 – Accumulator Connections (Cont.) AP Dept. Activities Report September 20, 2006 Dixon Bogert
Phase 2 – Accumulator Connections (Sketch) AP Dept. Activities Report September 20, 2006 Dixon Bogert
Phase 2 – Accumulator Connections (Utilities) AP Dept. Activities Report September 20, 2006 Dixon Bogert
FESS Deliverables AP Dept. Activities Report September 20, 2006 Dixon Bogert
DOE Space Offsets AP Dept. Activities Report September 20, 2006 Dixon Bogert
Reviews for NSF and DOE (1) AP Dept. Activities Report September 20, 2006 Dixon Bogert
Reviews for NSF and DOE (2) AP Dept. Activities Report September 20, 2006 Dixon Bogert
SciBooNE Civil Construction SciBooNE is an experiment that is moving the “SciBar” Detector from Japan to the United States for a test run before returning it to Japan for installation at JPARC. The detector is to be installed 100 meters downstream of the MiniBooNE Target at MI-12. The excavation for the detector enclosure is starting in the immediate future; Notice to Proceed was gi8ven to the contractor last Tuesday, Sept 19th, and the contract is for beneficial occupancy in 90 days, on December 11th. The work is shown in the following two slides. AP Dept. Activities Report September 20, 2006 Dixon Bogert
SciBooNE Civil Construction Mini BooNE Target SciBooNE Detector 100 meters AP Dept. Activities Report September 20, 2006 Dixon Bogert
SciBooNE Detector AP Dept. Activities Report September 20, 2006 Dixon Bogert
Putting the Proton Driver “on the shelf” The Proton Driver electronic drawings are all filed. A wetlands delineation report in south half of Main Ring infield will be presented next Wednesday, 9/27/06, and filed. A soil borings report will be presented next Wednesday, 9/27/06, and filed. The Accelerator Division/Mech Support Department is looking for space to consolidate neutrino horn/target production/testing in addition to MI-8. They are proposing a south extension onto the existing MI-65 (NuMI Target Service Building.) This conflicts with the route of the Proton Driver 8-GeV line. AP Dept. Activities Report September 20, 2006 Dixon Bogert
AD is considering extending MI-65 to the South AP Dept. Activities Report September 20, 2006 Dixon Bogert
AD is considering extending MI-65 to the South MI-65 South Extension here AP Dept. Activities Report September 20, 2006 Dixon Bogert
AP4 Line SNUMI Phase 2 makes Mu2E possible • The beam is slow spilled extracted from the Debuncher at either D30 or D50 • At D30, the extracted beam goes towards AP3 • At D350, the extracted beam heads northwest A-D Line AP5 Line AP Dept. Activities Report September 20, 2006 Dixon Bogert
Location of Mu2E target and detector Target Giese Road Detector AP-10 AP-30 AP-50 Extracted Beam Line From Debuncher MI-8 AP Dept. Activities Report September 20, 2006 Dixon Bogert
Neutrino Beams for DUSEL are possible AP Dept. Activities Report September 20, 2006 Dixon Bogert
Neutrino Beams for DUSEL are possible AP Dept. Activities Report September 20, 2006 Dixon Bogert
Backup Slides Additional Information is found in the following slides AP Dept. Activities Report September 20, 2006 Dixon Bogert
SNUMI MI-14 Kicker Building AP Dept. Activities Report September 20, 2006 Dixon Bogert
MI-39 Kicker Building at MI-40 AP Dept. Activities Report September 20, 2006 Dixon Bogert
F17 is a model for these Buildings These drawings are taken from Project 6-6-8A AP Dept. Activities Report September 20, 2006 Dixon Bogert
4th Anode Supply Room at MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert
4th Anode Supply Room Location at MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert
4th Anode Supply Room/blast wall at MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert
Buss Bar Insertion at MI-60 AP Dept. Activities Report September 20, 2006 Dixon Bogert
Additional Cooling Pond at MI-60 Ponds A/B AP Dept. Activities Report September 20, 2006 Dixon Bogert
Phase 2 – AP-4 Connection - 8 GeV Exit Point AP Dept. Activities Report September 20, 2006 Dixon Bogert
Phase 2 – AP-4 Connection - 8 GeV Exit Point AP Dept. Activities Report September 20, 2006 Dixon Bogert