1 / 11

2015 RTP Scope and Process Review October 21, 2014

2015 RTP Scope and Process Review October 21, 2014. Outline. 2015 RTP: What’s New 2015 RTP Process 2015 RTP Timeline. 2015 RTP: What’s New. New TPL Standard TPL-001-4 will be in effect for 2015 RTP

Download Presentation

2015 RTP Scope and Process Review October 21, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2015 RTP Scope and Process Review October 21, 2014

  2. Outline • 2015 RTP: What’s New • 2015 RTP Process • 2015 RTP Timeline

  3. 2015 RTP: What’s New • New TPL Standard TPL-001-4 will be in effect for 2015 RTP • Scope of contingency definitions considered for the RTP will be broadened to include all categories applicable to TPL-001-4 • Additional sensitivity cases and analysis will be performed

  4. 2015 RTP: Impact of new TPL standards • New Off-peak (minimum load case) will be studied as a base case along with the summer peak cases • New contingency categories, P0-P7 and extreme events instead of A, B, C and D will be studied • Shunt devices to be considered as single element contingencies • Open Line (one-end of the line) without a fault • Definition of second level contingency in G-1+N-1 expanded to include Generators and Shunt devices

  5. 2015 RTP: Impact of new TPL standards • Non-consequential load shedding shall no longer be an acceptable mitigation plan for the following contingencies • P2-2-Bus Section Fault (345-kV) • P2-3 Internal failure of non-bus tie breaker (345-kV) • P3-1 G-1+G-1 • P4 – Stuck breaker of non-bus-tie breaker (345-kV) • P5 – Failure of non-redundant relay (345-kV) • Req. 3.3.1 of TPL-001-4 requires automatic tripping of elements where relay loadability limits are exceeded post-contingency • Until such ratings are added to the models a default limit of 115% will be used for 345-kV elements and 100% will be used for elements below 345-kV

  6. 2015 RTP: Impact of new TPL standards • New sensitivity cases will be studied for each of the base cases • The sensitivity case for 2015 RTP will be prepared to study the effect of reduced reactive resource capability • Short Circuit Analysis will be conducted on year 3 and 5 summer peak cases with all projects modeled.

  7. 2015 RTP: Other updates • Reserve margin of 2800 MW (instead of 1375 MW) will be used in the reliability cases to address G-1+G-1 conditions • Dynamic ratings will be applied in reliability analysis (in addition to the economic analysis) • TPs will be requested to identify generic equipment type which may take longer to replace; these will be studied as a first level contingency in N-1+N-1 test

  8. 2015 RTP Process

  9. 2015 RTP: Timeline (tentative)

  10. Questions?