170 likes | 362 Views
Overarching Strategy For the Sabie and Crocodile River Systems. Crocodile River Catchment. Areas Included: Nelspruit White River Karino Plaston Nsikazi South Matsulu. Water Balance For Crocodile River Without Interventions. Intervention Options For Crocodile River Catchment.
E N D
Overarching Strategy For the Sabie and Crocodile River Systems
Crocodile River Catchment Areas Included: • Nelspruit • White River • KarinoPlaston • Nsikazi South • Matsulu
Water Balance For Crocodile River With Interventions – No Dam IAPs Operating Rules Groundwater Resource
Water Balance For Crocodile River With Interventions & Dam Boschjeskop Dam IAPs Operating Rules Groundwater Resource
Conclusions For Crocodile River • Low growth water requirements scenario can be met • A dam will be required to meet the high growth water requirements scenario. • Dam could be upstream or downstream of MLM. If downstream, water swops between MLM and irrigators will be required. • Effect on aquatic environment needs to be investigated if lower dam is chosen
Urgent Actions Required • The current IAP removal programme should be checked and if necessary, the focus areas should be changed and the programme accelerated. • WC/WDM Plans and implementation strategy to be developed • Groundwater can be developed to contribute in overcoming the short term water shortages
Towards Final Strategy – Further Information Required • Area of fallow irrigation lands with water entitlements with no or limited risks of farm workers losing jobs which can possibly be earmarked for water trading. • The preferred dam option needs to be selected. Choice between Boschjekop, Mountain View and Strathmore Dams.
Sabie River Catchment Areas Included: • Hazyview • Nsikazi North
Water Balance For Sabie River With Interventions Water Trading Groundwater Resource
Conclusions For Sabie River Catchment • WC/WDM and groundwater development will improve the situation but will not achieve the required water balance. • To achieve the water balance, water trading needs to be considered. The area of fallow irrigation lands with water entitlements with no or limited risks of farm workers losing jobs which can possibly be earmarked for water trading, needs to be .
Urgent Actions Required • Development of the WC/WDM plan and implementation strategy • Borehole siting with latest technology • DWA to develop a policy for water trading
Towards Final Strategy – Further Information Required • The area of fallow irrigation lands with water entitlements with no or limited risks of farm workers losing jobs which can possibly be earmarked for water trading. • The environmental water requirements of the Sabie River if the Reserve is optimised.