30 Minute average load

30 Minute average load. Average. 30 Minutes. Motor Starting. Soft start. 30 min Average. 500 kWh / ½ h = 1 000 kW – Average load. 500 kVAh / ½ h = 1 000 kVA. Block Interval Demand Control. Synchronising pulses from Municipal meter. Target demand. kVAh. Shed point. Ideal.

molly
Download Presentation

30 Minute average load

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 30 Minute average load Average 30 Minutes

  2. Motor Starting Soft start 30 min Average

  3. 500 kWh / ½ h = 1 000 kW – Average load 500 kVAh / ½ h = 1 000 kVA

  4. Block Interval Demand Control Synchronising pulses from Municipal meter Target demand kVAh Shed point Ideal 30 Minutes