1 / 18

GIS B105 & T105 General view

GIS B105 & T105 General view. GIS –B105 Clarifications Requirement. to be indicated/clarified with contractor or customer at technical clarifications meeting. Maintenance constraints GIS High Voltage test. 245KV GIS.

monita
Download Presentation

GIS B105 & T105 General view

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GIS B105 & T105 General view

  2. GIS –B105Clarifications Requirement to be indicated/clarified with contractor or customer at technical clarifications meeting • Maintenance constraints • GIS High Voltage test 245KV GIS

  3. GIS – B105 Some Installation Requirements to be indicated to contractor or customer Space for VT location Space for malt operation Mini distance between BB and wall indicated by GIS

  4. GIS – B105 Some Installation Requirements to be indicated to contractor or customer When basement applies, it is important to clarify the supply of cable tray under the GIS slab as well as the cable runway to enable the GIS low voltage engineering dept to define the necessary length between LCC and GIS apparatus This detail can be added into the GIS Civil work drawing

  5. GIS – B105 Some Installation Requirements to be indicated / clarified with Contractor Data on travelling crane to perform maintenance Minimum distance for maintenance of GIS (to take care if a maintenance truck is proposed)

  6. GIS – B105 Partial Discharge And Dielectric Tests BB1 BB2 Space required for GIS HV test indicated by GIS Supplier EX :TESTING GENERATOR with associated connections usually around 3,5 tons equipment – load for CW

  7. GIS –T155Clarifications Requirementto be indicated / clarified with Contractor or customer at Technical clarifications meeting • Maintenance constraints • GIS High Voltage test 420KV GIS 420KV side

  8. GIS – T155 Some Installation Requirements to be indicated to Contractor or customer A A : Minimum distance for maintenance indicated by GIS Supplier Take into account bending radius, with former to size basement

  9. GIS – T155 Some Installation Requirements to be clarified with contractor during technical clarification Mini distance between BB and wall indicated on GIS drwg Distances between several layers of GIL : indicative value only

  10. to be clarified with contractor during technical clarification GIS – T155 Some Installation Requirements Dilatation joint L>40 m Access door Dismantling space Area for dielectric tests Avoid beam and poles Gas treatment machine

  11. to be clarified with contractor during technical clarification GIS – T155 Some Installation Requirements Crane approach for maintenance to be indicated Distance between LCC and CB indicated by GIS Corridor to move Gas treatment : DILO

  12. (What’s important for the GIS?) OHL Incoming

  13. GIS – T155 Dielectric Test With Outdoor Bushing Space required for GIS test indicated by GIS Supplier To clarify with contractor means type and access to testing zone for testing equipment arrangement Capacitive divider & Transf Testing generator Gantry

  14. GIS – T155 Dielectric Test with Outdoor Bushing 2600 mm 8200 mm 20 tons 5 tons (packed in container) 10 tons (5+5) (container)

  15. GIS – T155 HV Cable Testing GIS manufacturer recommend to avoid supplying of test bushing and advise test following IEC 6207 § 14-2 Cable energised for 24h

  16. GIS – T155 HV Cable Testing Indoor When HV cable test is performed through the GIS, it leads to a different design of the building with major cost impact.

  17. GIS – T155 HV Cable Testing Outdoor Note : To be careful about the surrounding area of the test bushing.

  18. GIS – T155 HV Busduct/Wall The PDC coupler may be positioned at an interface with the wall due to lack of information of position at the beginning of project. It is recommended to check with contractor or customer for this kind of risk during technical clarifications.